Cnoc Farasd Wind Farm (28.8 MW)
Cnoc Farasd Wind Farm is a 28.8 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 4 December 2025, no decision recorded; the record was last updated on 9 January 2026.
28.8 MWwind farm
application submittedstatus in REPD
9 January 2026record last updated
Highlandcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 4 December 2025 | Application submitted |
Project details
- Technology
- wind farm
- Capacity
- 28.8 MW
- Status (REPD)
- application submitted
- Record last updated
- 9 January 2026
- Operator or applicant
- E Power Limited
- Planning authority
- Highland
- Planning application reference
- 25/04604/FUL
- Turbines
- 6
- Turbine height
- 150 m
- Address (REPD)
- Ne/O The Lodge, Buntait, Glenurquhart, Inverness
- Council area (by location)
- Highland
- REPD reference
- 17575
The scheme also includes 15 MW of battery storage, recorded separately in REPD (application submitted).
Who decides
| Applications | Highland | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 160 | 10,236 |
| Refused | 68 (42%) | 19% |
| Solar refused | 0 of 15 | 12% |
| Onshore wind refused | 61 of 114 | 45% |
| Battery storage refused | 7 of 31 | 16% |
| Median time from submission to decision | 52.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 20 / 20 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Cnoc an Eas Wind Farm | wind farm | 44.2 | refused on appeal | 1.7 |
| Kerrow Farm | battery storage | 20 | application withdrawn | 9.3 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.3552, -4.6446).