Draughton Maidwell Wind Farm (21 MW)

Draughton Maidwell Wind Farm is a 21 MW wind farm project in North Northamptonshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 20 September 2010; the record was last updated on 12 September 2011.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

21 MWwind farm
refused on appealstatus in REPD
12 September 2011record last updated
North Northamptonshirecouncil area

Planning timeline

DateStage
1 April 2009Application submitted
27 January 2010Refused by the planning authority
20 September 2010Appeal refused

Project details

Technology
wind farm
Capacity
21 MW
Status (REPD)
refused on appeal
Record last updated
12 September 2011
Operator or applicant
Nuon UK
Planning authority
West Northamptonshire
Planning application reference
DA/2009/0168
Turbines
7
Address (REPD)
Land to the north of Draughton Harrington, Draughton, Northamptonshire
Council area (by location)
North Northamptonshire
Time to decision
43 weeks
REPD reference
3547

Who decides

ApplicationsWest NorthamptonshireUK
Decided applications (solar, wind, battery)8710,236
Refused23 (26%)19%
Solar refused12 of 6512%
Onshore wind refused9 of 1245%
Battery storage refused2 of 1016%
Median time from submission to decision13.0 weeks17.0 weeks
Appeals lodged / allowed7 / 10—

Other large projects within 10 km

ProjectTypeMWStatuskm
Brixworth Windfarmwind farm13application withdrawn5.7
Kelmarsh Wind Farm (Resubmission)wind farm12.5operational6.2
Eckland Lodge Farm, Braybrookebattery storage500application submitted6.6
Hall Farm (Hannington)solar farm10.9permission expired7.3
Brixworth Landfill, Scaldwell Road Solar Array & Battery Storagesolar farm5.6application submitted7.3
Braybrooke Battery Energy Storage Systembattery storage500application submitted7.4
Gaultney Solar Parksolar farm20.5operational7.6
Braybrooke Village North, Harborough Roadbattery storage252application submitted8.0
RAF Desboroughsolar farm49.9permission expired9.5