East Rightadown Farm, Brandis Corner Solar Farm (7.6 MW)

East Rightadown Farm, Brandis Corner Solar Farm is a 7.6 MW solar farm project in Torridge, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 1 September 2023, not yet built; the record was last updated on 15 July 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

7.6 MWsolar farm
approved, not builtstatus in REPD
15 July 2025record last updated
Torridgecouncil area

Planning timeline

DateStage
1 February 2023Application submitted
1 September 2023Planning permission granted
1 September 2026Permission expired

Project details

Technology
solar farm
Capacity
7.6 MW
Status (REPD)
approved, not built
Record last updated
15 July 2025
Operator or applicant
Black Torrington Solar Limited
Planning authority
Torridge
Planning application reference
1/1300/2022/FULM
Site area
10.5 ha
Address (REPD)
East Rightadown Farm, Brandis Corner
Council area (by location)
Torridge
Time to decision
30 weeks
Name in REPD
East Rightadown Farm, Brandis Corner - Solar Farm
REPD reference
13219

Recorded together with East Rightadown Farm, Brandis Corner (battery storage, approved, not built).

Who decides

ApplicationsTorridgeUK
Decided applications (solar, wind, battery)4510,236
Refused12 (27%)19%
Solar refused4 of 3112%
Onshore wind refused6 of 845%
Battery storage refused2 of 616%
Median time from submission to decision24.1 weeks17.0 weeks
Appeals lodged / allowed3 / 7—

Other large projects within 10 km

ProjectTypeMWStatuskm
Dunsland Cross Wind Farmwind farm7.5operational1.6
Foxcombe Farm Solar Parksolar farm5operational4.0
Chalhanger Farm Solar Parksolar farm6refused on appeal5.5
West Venn Solar Farmsolar farm5operational7.9
Derriton Fields Solar Farmsolar farm11.8operational9.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.8144, -4.2399).