Esgair Cwmowen (47.5 MW wind farm)

Esgair Cwmowen is a 47.5 MW wind farm project in Powys, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 21 May 2010, no decision recorded; the record was last updated on 3 October 2018. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

47.5 MWwind farm
application submittedmay be out of datestatus in REPD
3 October 2018record last updated
Powyscouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
21 May 2010Application submitted

Project details

Technology
wind farm
Capacity
47.5 MW
Status (REPD)
application submitted
Record last updated
3 October 2018
Operator or applicant
Pennant Walters
Planning authority
Powys
Planning application reference
P/2010/0890
Turbines
19
Address (REPD)
Land at Esgair Cwmowen Nr Carno
Council area (by location)
Powys
REPD reference
4728

Who decides

ApplicationsPowysUK
Decided applications (solar, wind, battery)4210,236
Refused15 (36%)19%
Solar refused2 of 1512%
Onshore wind refused12 of 2445%
Battery storage refused1 of 316%
Median time from submission to decision78.6 weeks17.0 weeks
Appeals lodged / allowed5 / 3—

UK: all UK planning authorities. Counted under these REPD planning authority names: DECC (S36), Powys.

Other large projects within 10 km

ProjectTypeMWStatuskm
Mynydd Waun Fawr Wind Farmwind farm37.5application withdrawn5.4
Mynydd Clogau Wind Farmwind farm14.5operational5.7
Mynydd Clogau Wind Farm - Extensionwind farm16application withdrawn5.7
Tirgwyntwind farm24.6operational6.8
Mynydd Yr Hendre Wind Farmwind farm29.1refused7.7
Esgair Cwmowenwind farm51application withdrawn8.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.6204, -3.3796).