Forrestfield Wind Farm (13.2 MW)

Forrestfield Wind Farm is a 13.2 MW wind farm project in North Lanarkshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 2 July 2015, no decision recorded; the record was last updated on 6 August 2015. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

13.2 MWwind farm
application submittedmay be out of datestatus in REPD
6 August 2015record last updated
North Lanarkshirecouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
2 July 2015Application submitted

Project details

Technology
wind farm
Capacity
13.2 MW
Status (REPD)
application submitted
Record last updated
6 August 2015
Operator or applicant
West Cost Energy
Planning authority
North Lanarkshire
Planning application reference
15/01411/FUL
Turbines
4
Turbine height
125 m
Address (REPD)
Site South Of, Airdrie Road, Caldercruix, Airdrie, Strathclyde
Council area (by location)
North Lanarkshire
REPD reference
5348

Who decides

ApplicationsNorth LanarkshireUK
Decided applications (solar, wind, battery)3810,236
Refused9 (24%)19%
Solar refused0 of 1412%
Onshore wind refused8 of 2045%
Battery storage refused1 of 416%
Median time from submission to decision34.4 weeks17.0 weeks
Appeals lodged / allowed3 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Nether braco Farmwind farm21application withdrawn1.9
Bracco / Black Hillwind farm72.5application withdrawn3.0
Dewshill Wind Farmwind farm9approved, not built3.1
Heights Road, Blackridge - Woodend Wind Farmwind farm19.8application submitted3.5
Drumduff Wind Farm Extensionwind farm15approved, not built3.8
Drumduffwind farm8.5operational3.9
West Benhar Road, Eastfield, Harthillwind farm20application submitted4.0
Torrance Farmwind farm9operational4.5
Torrance Farm Wind Park Extensionwind farm5.7operational4.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.8769, -3.8181).