Gwenlais Solar Farm (16.3 MW)

Gwenlais Solar Farm is a 16.3 MW solar farm project in Swansea, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 11 June 2025, not yet built; the record was last updated on 19 May 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

16.3 MWsolar farm
approved, not builtstatus in REPD
19 May 2026record last updated
Swanseacouncil area

Planning timeline

DateStage
14 March 2024Application submitted
11 June 2025Planning permission granted

Project details

Technology
solar farm
Capacity
16.3 MW
Status (REPD)
approved, not built
Record last updated
19 May 2026
Operator or applicant
Solar Securities Group Limited
Planning authority
Swansea
Planning application reference
DNS CAS-02282-Z9M8L7
Site area
32.6 ha
Address (REPD)
Ne/O Gwenlais Farm, Carmel Road, Pontlliw, Swansea
Council area (by location)
Swansea
Time to decision
65 weeks
Name in REPD
Gwenlais Farm, Carmel Road - Gwenlais Solar Farm
REPD reference
12861

The scheme also includes battery storage, recorded separately in REPD (approved, not built).

Who decides

ApplicationsSwanseaUK
Decided applications (solar, wind, battery)3510,236
Refused9 (26%)19%
Solar refused5 of 2012%
Onshore wind refused2 of 345%
Battery storage refused2 of 1216%
Median time from submission to decision18.1 weeks17.0 weeks
Appeals lodged / allowed4 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Castell Ddu Solar Farmsolar farm5permission expired1.0
Gelliwern Isaf Farmsolar farm6operational1.8
Coed Bach Park, Gwynfryn Roadrooftop solar15application submitted2.4
Solar Farm at The E/O Pontlliwsolar farm40application submitted3.5
Lletty Scilp Farm, Swansea Northbattery storage400approved, not built3.9
Land at Lltty Morphil Farmsolar farm5abandoned3.9
Bryntywod, Llangyfelachbattery storage200approved, not built4.1
Parc Solar Caenewyddsolar farm42under construction4.2
Abergelli Farm, Felindrebattery storage250application submitted4.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.6926, -4.0152).