Hagshaw Energy Cluster – Western Expansion (130 MW wind farm)

Hagshaw Energy Cluster – Western Expansion is a 130 MW wind farm project in South Lanarkshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 8 May 2025, no decision recorded; the record was last updated on 13 June 2025. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

130 MWwind farm
application submittedstatus in REPD
13 June 2025record last updated
South Lanarkshirecouncil area

Planning timeline

DateStage
8 May 2025Application submitted

Project details

Technology
wind farm
Capacity
130 MW
Status (REPD)
application submitted
Record last updated
13 June 2025
Operator or applicant
3R Energy Solutions Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00004623
Turbines
18
Turbine height
230 m
Address (REPD)
Hagshaw Hill Farm
Council area (by location)
South Lanarkshire
REPD reference
12284

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Hagshaw Energy Cluster – Western Expansionsolar farm60application submitted<0.1
Hagshaw Energy Cluster – Western Expansionbattery storage225application submitted0.1
Hagshaw Hill (Repowering)wind farm84operational0.1
Hagshaw Hillbattery storage20approved, not built0.1
Hagshaw Hill Wind Farmwind farm7.8operational3.2
Hagshaw Hill Wind Farmwind farm7.8operational3.2
Poniel Wind Turbineswind farm9application withdrawn3.2
Hagshaw Hill Wind Farm Extensionwind farm26operational3.3
Douglas West and Dalquhandy Renewable Energy Projectwind farm45operational3.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.5585, -3.8703).