Hagshaw Hill Wind Farm Extension (26 MW)

Hagshaw Hill Wind Farm Extension is a 26 MW wind farm project in South Lanarkshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 October 2008; the record was last updated on 4 September 2009.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

26 MWwind farm
operationalstatus in REPD
4 September 2009record last updated
South Lanarkshirecouncil area

Planning timeline

DateStage
10 January 2005Application submitted
28 December 2005Planning permission granted
1 October 2008Operational

Project details

Technology
wind farm
Capacity
26 MW
Status (REPD)
operational
Record last updated
4 September 2009
Operator or applicant
Scottish Power Renewables
Planning authority
South Lanarkshire
Planning application reference
not recorded
Turbines
20
Address (REPD)
Extension to current Windfarm at Hagshaw Hill
Council area (by location)
South Lanarkshire
Time to decision
50 weeks
REPD reference
3220

Who decides

ApplicationsSouth LanarkshireUK
Decided applications (solar, wind, battery)8910,236
Refused30 (34%)19%
Solar refused2 of 2012%
Onshore wind refused21 of 5645%
Battery storage refused7 of 1316%
Median time from submission to decision47.4 weeks17.0 weeks
Appeals lodged / allowed6 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Hagshaw Hill Wind Farmwind farm7.8operational1.2
Hagshaw Hill Wind Farmwind farm7.8operational1.3
Cumberhead Wind Farmwind farm48operational2.5
Spireslack Windfarmwind farm59.6application withdrawn2.9
Douglas West and Dalquhandy Renewable Energy Projectwind farm45operational3.0
Douglas West Wind Farm (extension)wind farm78under construction3.0
Hagshaw Hill (Repowering)wind farm84operational3.2
Hagshaw Hillbattery storage20approved, not built3.2
Hagshaw Energy Cluster – Western Expansionbattery storage225application submitted3.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.5666, -3.9203).