Hill of Braco (20 MW wind farm)

Hill of Braco is a 20 MW wind farm project in Aberdeenshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 27 August 2013; the record was last updated on 18 September 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWwind farm
application withdrawnstatus in REPD
18 September 2013record last updated
Aberdeenshirecouncil area

Planning timeline

DateStage
28 February 2013Application submitted
27 August 2013Application withdrawn

Project details

Technology
wind farm
Capacity
20 MW
Status (REPD)
application withdrawn
Record last updated
18 September 2013
Operator or applicant
PNE Wind UK Ltd (Brookfield)
Planning authority
Aberdeenshire
Planning application reference
APP/2013/0505
Turbines
8
Address (REPD)
Hatton Peterhead AB42 0RR
Council area (by location)
Aberdeenshire
REPD reference
3551

Who decides

ApplicationsAberdeenshireUK
Decided applications (solar, wind, battery)20010,236
Refused64 (32%)19%
Solar refused1 of 4012%
Onshore wind refused60 of 13245%
Battery storage refused3 of 2816%
Median time from submission to decision40.6 weeks17.0 weeks
Appeals lodged / allowed15 / 13—

Other large projects within 10 km

ProjectTypeMWStatuskm
Netherton, Langside Roadbattery storage400application submitted4.6
Hillhead Of Gask, Longhavensolar farm14.2under construction4.9
Greystone, Blackhillsbattery storage500application submitted5.6
Flushing, Longsidebattery storage400application submitted6.0
Kinmuck Battery Energy Storagebattery storage105approved, not built6.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.4591, -1.9368).