Hill Of Lynchrobbie, Dunbeath (7.2 MW wind farm)

Hill Of Lynchrobbie, Dunbeath is a 7.2 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 3 February 2025, no decision recorded; the record was last updated on 14 February 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

7.2 MWwind farm
application submittedstatus in REPD
14 February 2025record last updated
Highlandcouncil area

Planning timeline

DateStage
3 February 2025Application submitted

Project details

Technology
wind farm
Capacity
7.2 MW
Status (REPD)
application submitted
Record last updated
14 February 2025
Operator or applicant
E Power Limited
Planning authority
Highland
Planning application reference
25/00107/FUL
Turbines
2
Turbine height
150 m
Address (REPD)
Hill Of Lynchrobbie Dunbeath
Council area (by location)
Highland
Name in REPD
Hill Of Lynchrobbie, Dunbeath - Wind Turbines
REPD reference
14399

The scheme also includes 5 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

ApplicationsHighlandUK
Decided applications (solar, wind, battery)16010,236
Refused68 (42%)19%
Solar refused0 of 1512%
Onshore wind refused61 of 11445%
Battery storage refused7 of 3116%
Median time from submission to decision52.3 weeks17.0 weeks
Appeals lodged / allowed20 / 20—

Other large projects within 10 km

ProjectTypeMWStatuskm
Boulfruichwind farm13operational2.3
Forse Wind Farmwind farm60abandoned4.8
Dunbeathwind farm66refused7.0
Golticlay Wind Farmwind farm72.6under construction8.0
Golticlay Wind Farm 2wind farm13.2no application required8.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.2888, -3.41).