Kilgallioch Windfarm (Extension Solar) (20 MW)

Kilgallioch Windfarm (Extension Solar) is a 20 MW solar farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 11 January 2022. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWsolar farm
abandonedstatus in REPD
11 January 2022record last updated
Dumfries and Gallowaycouncil area

Planning timeline

DateStage
16 December 2019Application submitted

Project details

Technology
solar farm
Capacity
20 MW
Status (REPD)
abandoned
Record last updated
11 January 2022
Operator or applicant
Scottish Power Renewables
Planning authority
Scottish Government (S36)
Planning application reference
ECU00001996
Address (REPD)
High Eldrig, land 12 km NW of Kirkcowan, SE of Kilgallioch Windfarm
Council area (by location)
Dumfries and Galloway
Name in REPD
Kilgallioch Windfarm (Extension - Solar)
REPD reference
7851

Recorded together with Kilgallioch Windfarm (Extension) (50.4 MW wind farm, under construction).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Artfield Fellwind farm19.5operational3.5
Glenchamber Wind Farmwind farm27.5operational3.5
Gass Wind Farmwind farm20.7permission expired3.6
Kilgallioch wind farmwind farm239operational4.2
Hill of Ochiltreewind farm23refused8.8
Garvilland Farmwind farm18approved, not built8.9
Arecleoch Wind Farm (extension)wind farm72.8under construction9.2
Arecleoch Wind Farm (extension)battery storage20under construction9.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.9937, -4.7371).