Gass Wind Farm (20.7 MW)
Gass Wind Farm is a 20.7 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: planning permission expired; the record was last updated on 21 September 2020.
20.7 MWwind farm
permission expiredstatus in REPD
21 September 2020record last updated
Dumfries and Gallowaycouncil area
Planning timeline
| Date | Stage |
|---|---|
| 25 November 2014 | Application submitted |
| 26 August 2015 | Planning permission granted |
Project details
- Technology
- wind farm
- Capacity
- 20.7 MW
- Status (REPD)
- permission expired
- Record last updated
- 21 September 2020
- Operator or applicant
- WilloWind Energy
- Planning authority
- Dumfries and Galloway
- Planning application reference
- 14/P/1/0674
- Turbines
- 9
- Turbine height
- 127 m
- Address (REPD)
- Land to the north east of Glenluce
- Council area (by location)
- Dumfries and Galloway
- Time to decision
- 39 weeks
- REPD reference
- 2858
Who decides
| Applications | Dumfries and Galloway | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 106 | 10,236 |
| Refused | 40 (38%) | 19% |
| Solar refused | 1 of 18 | 12% |
| Onshore wind refused | 33 of 72 | 45% |
| Battery storage refused | 6 of 16 | 16% |
| Median time from submission to decision | 60.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 19 / 17 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Glenchamber Wind Farm | wind farm | 27.5 | operational | 1.5 |
| Artfield Fell | wind farm | 19.5 | operational | 2.9 |
| Kilgallioch Windfarm (Extension Solar) | solar farm | 20 | abandoned | 3.6 |
| Kilgallioch Windfarm (Extension) | wind farm | 50.4 | under construction | 3.6 |
| Kilgallioch wind farm | wind farm | 239 | operational | 5.4 |
| Garvilland Farm | wind farm | 18 | approved, not built | 6.0 |
| Shennanton Wind Farm | wind farm | 30 | refused on appeal | 7.6 |
| Annabaglish Wind Farm | wind farm | 35 | refused on appeal | 9.0 |
| Shennanton Wind Farm | wind farm | 30 | application submitted | 9.0 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.9616, -4.7314).