Lady Ings Farm, Middlestown Solar Photovoltaic Farm (49.9 MW)

Lady Ings Farm, Middlestown Solar Photovoltaic Farm is a 49.9 MW solar farm project in Wakefield, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 14 November 2022, not yet built; the record was last updated on 23 April 2025. REPD also records that the planning permission expired on 14 November 2025, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
approved, not builtmay be out of datestatus in REPD
23 April 2025record last updated
Wakefieldcouncil area

REPD also records that the planning permission expired on 14 November 2025, so the project may not go ahead in this form.

Planning timeline

DateStage
20 December 2021Application submitted
14 November 2022Planning permission granted
14 November 2025Permission expired

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
approved, not built
Record last updated
23 April 2025
Operator or applicant
Boom Developments Limited
Planning authority
Wakefield
Planning application reference
21/02792/FUL
Site area
75.3 ha
Address (REPD)
58 Low Lane, Middlestown
Council area (by location)
Wakefield
Time to decision
47 weeks
Name in REPD
Lady Ings Farm, Middlestown - Solar Photovoltaic Farm
REPD reference
10199

Who decides

ApplicationsWakefieldUK
Decided applications (solar, wind, battery)4510,236
Refused7 (16%)19%
Solar refused5 of 3612%
Onshore wind refused1 of 145%
Battery storage refused1 of 816%
Median time from submission to decision9.0 weeks17.0 weeks
Appeals lodged / allowed3 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
New Hall Farm, New Hall Lane Solar Farmsolar farm22.4approved, not built2.2
Low Farm, Flockton Solar Photovoltaic Farmsolar farm49.9approved, not built2.9
Owlers Farm, Wakefield Road Solar Farmsolar farm20approved, not built3.8
Haigh Lane, Woolley Edge Lane Solar Farmsolar farm29.7approved, not built5.6
Haigh Hall Solar Farmsolar farm5operational6.5
Neil Fox Waybattery storage99.9application submitted8.2
Neil Fox Waybattery storage99.9application submitted8.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6545, -1.5901).