Land at Moss Farm (North) (6 MW solar farm)
Land at Moss Farm (North) is a 6 MW solar farm project in Cheshire East, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: planning permission expired on 20 May 2019; the record was last updated on 3 September 2020.
6 MWsolar farm
permission expiredstatus in REPD
3 September 2020record last updated
Cheshire Eastcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 8 May 2015 | Application submitted |
| 20 May 2016 | Planning permission granted |
| 20 May 2019 | Permission expired |
Project details
- Technology
- solar farm
- Capacity
- 6 MW
- Status (REPD)
- permission expired
- Record last updated
- 3 September 2020
- Operator or applicant
- TGC Renewables/NESF
- Planning authority
- Cheshire East
- Planning application reference
- 15/2113N
- Site area
- 10.7 ha
- Address (REPD)
- Land at Moss Farm, Warmingham
- Council area (by location)
- Cheshire East
- Time to decision
- 54 weeks
- REPD reference
- 5939
Who decides
| Applications | Cheshire East | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 40 | 10,236 |
| Refused | 4 (10%) | 19% |
| Solar refused | 4 of 36 | 12% |
| Battery storage refused | 0 of 4 | 16% |
| Median time from submission to decision | 11.1 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 1 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Land at Moss Farm (South) | solar farm | 5 | permission expired | 0.3 |
| Drury Lane | solar farm | 17 | approved, not built | 0.6 |
| Leighton Hall Farm | battery storage | 20 | permission expired | 2.8 |
| Middlewich Road Solar Photovoltaics & Battery Storage | solar farm | 5 | approved, not built | 3.0 |
| Bentley Motors Ltd 1 | rooftop solar | 5.1 | operational | 3.1 |
| Dragons Lane | battery storage | 12 | approved, not built | 4.5 |
| Former EON Power Station, Booth Lane | battery storage | 20 | approved, not built | 5.0 |
| Land south of Wood Lane (Safeguard Bradwell) | solar farm | 5 | operational | 5.7 |
| Woodford Lane West Solar Farm (Hebden Green) | solar farm | 19 | approved, not built | 8.6 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.1294, -2.4515).