Former EON Power Station, Booth Lane (20 MW battery storage)

Former EON Power Station, Booth Lane is a 20 MW battery storage project in Cheshire East, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 11 April 2025, not yet built; the record was last updated on 20 May 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWbattery storage
approved, not builtstatus in REPD
20 May 2025record last updated
Cheshire Eastcouncil area

Planning timeline

DateStage
16 October 2024Application submitted
11 April 2025Planning permission granted
11 April 2028Permission due to expire (unless work starts)

Project details

Technology
battery storage (co-located with fossil fuel plant)
Capacity
20 MW
Status (REPD)
approved, not built
Record last updated
20 May 2025
Operator or applicant
Bluefield Sandbach Limited
Planning authority
Cheshire East
Planning application reference
24/4104/FUL
Address (REPD)
Former Power Station, Booth Lane, Moston
Council area (by location)
Cheshire East
Time to decision
25 weeks
Name in REPD
Former EON Power Station, Booth Lane - Battery Energy Storage System
REPD reference
17725

Earlier applications for this site

ApplicationMWSubmittedOutcome
Former EON Power Station, Booth Lane 21/6426C204 January 2022replaced by a revised application

Who decides

ApplicationsCheshire EastUK
Decided applications (solar, wind, battery)4010,236
Refused4 (10%)19%
Solar refused4 of 3612%
Battery storage refused0 of 416%
Median time from submission to decision11.1 weeks17.0 weeks
Appeals lodged / allowed2 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Dragons Lanebattery storage12approved, not built0.5
Land south of Wood Lane (Safeguard Bradwell)solar farm5operational1.7
Drury Lanesolar farm17approved, not built4.5
Land at Moss Farm (North)solar farm6permission expired5.0
Land at Moss Farm (South)solar farm5permission expired5.2
Middlewich Road Solar Photovoltaics & Battery Storagesolar farm5approved, not built5.9
Leighton Hall Farmbattery storage20permission expired7.8
Bentley Motors Ltd 1rooftop solar5.1operational8.0
Woodford Lane West Solar Farm (Hebden Green)solar farm19approved, not built10.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.1654, -2.4063).