Land south of Francis Land (10 MW solar farm)

Land south of Francis Land is a 10 MW solar farm project in Wrexham, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: planning permission expired on 13 September 2021; the record was last updated on 3 September 2020.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10 MWsolar farm
permission expiredstatus in REPD
3 September 2020record last updated
Wrexhamcouncil area

Planning timeline

DateStage
27 May 2015Application submitted
7 December 2015Refused by the planning authority
6 June 2016Appeal lodged
13 September 2016Planning permission granted
13 September 2016Appeal allowed
13 September 2021Permission expired

Project details

Technology
solar farm
Capacity
10 MW
Status (REPD)
permission expired
Record last updated
3 September 2020
Operator or applicant
TGC Renewables/NESF
Planning authority
Wrexham
Planning application reference
P/2015/0396
Appeal reference
APP/H6955/A/16/3147767
Site area
10.2 ha
Address (REPD)
Land South Of, Francis Lane, Holt, Wrexham, Clwyd
Council area (by location)
Wrexham
Time to decision
68 weeks
REPD reference
5281

Who decides

ApplicationsWrexhamUK
Decided applications (solar, wind, battery)2010,236
Refused3 (15%)19%
Solar refused2 of 1412%
Onshore wind refused1 of 145%
Battery storage refused0 of 516%
Median time from submission to decision21.8 weeks17.0 weeks
Appeals lodged / allowed2 / 2—

UK: all UK planning authorities. Counted under these REPD planning authority names: Newry, Mourne and Downe, Wrexham.

Other large projects within 10 km

ProjectTypeMWStatuskm
Land north of Bryn Lanesolar farm6.4permission expired0.4
Land at Borras Hallsolar farm10abandoned2.7
Williams Farmsolar farm5operational3.2
Maelor Gasworks Solar Farm & Battery Storagesolar farm5.7approved, not built3.4
Little Llwyn Onn Solar Farm & Battery Storagesolar farm9.9approved, not built3.8
Wrexham Social Housing PVrooftop solar5.4operational5.5
Plas Power Estate Solar Farmsolar farm57application submitted8.8
Bronwylfa Road, Rhostyllenbattery storage400application submitted8.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.0568, -2.9116).