Little Raith Farm - extension (18 MW wind farm)
Little Raith Farm - extension is an 18 MW wind farm project in Fife, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 30 June 2015; the record was last updated on 1 July 2015.
18 MWwind farm
refused on appealstatus in REPD
1 July 2015record last updated
Fifecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 18 July 2014 | Application submitted |
| 29 December 2014 | Appeal lodged |
| 30 June 2015 | Refused by the planning authority |
| 30 June 2015 | Appeal refused |
Project details
- Technology
- wind farm
- Capacity
- 18 MW
- Status (REPD)
- refused on appeal
- Record last updated
- 1 July 2015
- Operator or applicant
- WK Extension Project Ltd
- Planning authority
- Fife
- Planning application reference
- 14/02444/EIA
- Appeal reference
- PPA-250-2212
- Turbines
- 6
- Address (REPD)
- Little Raith Farm, Gleniston, Auchtertool, Fife
- Council area (by location)
- Fife
- Time to decision
- 50 weeks
- REPD reference
- 4490
Who decides
| Applications | Fife | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 91 | 10,236 |
| Refused | 17 (19%) | 19% |
| Solar refused | 0 of 36 | 12% |
| Onshore wind refused | 16 of 30 | 45% |
| Battery storage refused | 1 of 25 | 16% |
| Median time from submission to decision | 24.0 weeks | 17.0 weeks |
| Appeals lodged / allowed | 1 / 2 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Little Raith Farm | wind farm | 25 | operational | <0.1 |
| Clentrie Wind Farm (Gevens) | wind farm | 6.9 | operational | 0.2 |
| Glenniston Farm, Auchtertool Solar Farm | solar farm | 39 | approved, not built | 1.4 |
| Camilla Battery Storage | battery storage | 50 | operational | 1.4 |
| Gleniston, Auchtertool | battery storage | 49.5 | approved, not built | 1.5 |
| Mossmorran Battery Storage | battery storage | 300 | approved, not built | 1.8 |
| Westfield | wind farm | 10 | operational | 3.9 |
| Strathruddie, Kinglassie Solar farm | solar farm | 25 | approved, not built | 5.0 |
| Mossmorran Wind Farm | wind farm | 6 | application withdrawn | 5.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.1194, -3.2522).