Lochelbank Wind Farm (51 MW)
Lochelbank Wind Farm is a 51 MW wind farm project in Perth and Kinross, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 17 April 2009; the record was last updated on 17 April 2009.
51 MWwind farm
application withdrawnstatus in REPD
17 April 2009record last updated
Perth and Kinrosscouncil area
Planning timeline
| Date | Stage |
|---|---|
| 17 April 2009 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 51 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 17 April 2009
- Operator or applicant
- RWE npower
- Planning authority
- Perth and Kinross
- Planning application reference
- not recorded
- Address (REPD)
- North of Glenfarg
- Council area (by location)
- Perth and Kinross
- REPD reference
- 3228
Who decides
| Applications | Perth and Kinross | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 73 | 10,236 |
| Refused | 32 (44%) | 19% |
| Solar refused | 6 of 24 | 12% |
| Onshore wind refused | 23 of 31 | 45% |
| Battery storage refused | 3 of 18 | 16% |
| Median time from submission to decision | 28.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 7 / 8 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Lochelbank Wind Farm II | wind farm | 9.6 | operational | <0.1 |
| Shire-End Farm | solar farm | 17 | approved, not built | 4.4 |
| Binn Eco Park Solar | solar farm | 5 | approved, not built | 5.8 |
| Binn Eco Park Battery | battery storage | 10 | approved, not built | 5.8 |
| Binn Eco Park Wind Farm | wind farm | 10 | refused | 6.4 |
| Binn Eco Park Wind Farm | wind farm | 10 | operational | 6.4 |
| Carey Solar Farm | solar farm | 10 | permission expired | 6.8 |
| Cordon Farm, Abernethy | battery storage | 30 | application submitted | 8.0 |
| Cordon Farm | solar farm | 10 | permission expired | 8.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.3054, -3.4329).