Loganhead Wind Farm (53.8 MW)

Loganhead Wind Farm is a 53.8 MW wind farm project in Dumfries and Galloway, Scotland. Its status: consented by Scottish Ministers on 24 September 2026, not yet built (Scottish Government Energy Consents Unit). The Renewable Energy Planning Database (July 2026 extract) still records: application submitted on 10 November 2021, no decision recorded; the record was last updated on 10 February 2026. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

53.8 MWwind farm
approved, not builtstatus (Scottish Government Energy Consents Unit; status in REPD: application submitted)
10 February 2026record last updated
Dumfries and Gallowaycouncil area

Planning timeline

DateStage
10 November 2021Application submitted
24 September 2026Section 36 consent granted (Scottish Ministers)

Status source: Scottish Government Energy Consents Unit. The Renewable Energy Planning Database (July 2026 extract) still shows this project as “application submitted”.

Project details

Technology
wind farm
Capacity
53.8 MW
Status
approved, not built (Scottish Government Energy Consents Unit; REPD: application submitted)
Record last updated
10 February 2026
Operator or applicant
Muirhall Energy Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00002161
Turbines
8
Turbine height
200 m
Address (REPD)
off the B7068, approximately 4km northwest of Langholm and 15km northeast of Lockerbie
Council area (by location)
Dumfries and Galloway
Contracts for Difference
AR7a
REPD reference
16709

Earlier applications for this site

ApplicationMWSubmittedOutcome
Loganhead Wind Farm 15/P/4/027325.62 October 2015replaced by a revised application

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Hopsrig Wind Farmwind farm79.2application submitted2.2
Craig Wind Farmwind farm10operational2.3
Wind Farm & Battery Storage at Callisterhall Wind Farmwind farm39.2refused3.5
Crossdykeswind farm48operational4.4
Bloch Wind Farm & Battery Storage (Solway Bank Extension)wind farm126application submitted6.4
Solwaybank Wind Farmwind farm30operational7.9
Little Hartfell Wind Farmwind farm50.4application withdrawn9.1
Corbie Shankwind farm150application withdrawn10.0