Wind Farm & Battery Storage at Callisterhall Wind Farm (39.2 MW)
Wind Farm & Battery Storage at Callisterhall Wind Farm is a 39.2 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 19 December 2022; the record was last updated on 3 November 2021.
39.2 MWwind farm
refusedstatus in REPD
3 November 2021record last updated
Dumfries and Gallowaycouncil area
Planning timeline
| Date | Stage |
|---|---|
| 1 July 2022 | Application submitted |
| 19 December 2022 | Refused by the planning authority |
Project details
- Technology
- wind farm
- Capacity
- 39.2 MW
- Status (REPD)
- refused
- Record last updated
- 3 November 2021
- Operator or applicant
- Epower Limited
- Planning authority
- Dumfries and Galloway
- Planning application reference
- 22/0930/FUL
- Turbines
- 7
- Turbine height
- 200 m
- Address (REPD)
- Callisterhall Wind Farm, Langholm
- Council area (by location)
- Dumfries and Galloway
- Time to decision
- 24 weeks
- Name in REPD
- Callisterhall Wind Farm - Wind Farm & Battery Storage
- REPD reference
- 9889
The scheme also includes 7 MW of battery storage, recorded separately in REPD (refused).
Who decides
| Applications | Dumfries and Galloway | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 106 | 10,236 |
| Refused | 40 (38%) | 19% |
| Solar refused | 1 of 18 | 12% |
| Onshore wind refused | 33 of 72 | 45% |
| Battery storage refused | 6 of 16 | 16% |
| Median time from submission to decision | 60.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 19 / 17 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Loganhead Wind Farm | wind farm | 53.8 | application submitted | 3.5 |
| Craig Wind Farm | wind farm | 10 | operational | 4.4 |
| Bloch Wind Farm & Battery Storage (Solway Bank Extension) | wind farm | 126 | application submitted | 4.6 |
| Solwaybank Wind Farm | wind farm | 30 | operational | 4.8 |
| Crossdykes | wind farm | 48 | operational | 4.8 |
| Hopsrig Wind Farm | wind farm | 79.2 | application submitted | 4.9 |
| Little Hartfell Wind Farm | wind farm | 50.4 | application withdrawn | 8.0 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.1418, -3.1265).