Manston Solar Farm (9.9 MW)

Manston Solar Farm is a 9.9 MW solar farm project in Thanet, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 28 March 2013; the record was last updated on 23 January 2014.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

9.9 MWsolar farm
operationalstatus in REPD
23 January 2014record last updated
Thanetcouncil area

Planning timeline

DateStage
17 September 2012Application submitted
27 November 2012Planning permission granted
28 March 2013Operational

Project details

Technology
solar farm
Capacity
9.9 MW
Status (REPD)
operational
Record last updated
23 January 2014
Operator or applicant
Vogt Solar
Planning authority
Thanet
Planning application reference
F/TH/12/0722
Site area
13.0 ha
Address (REPD)
Great West Autos, Manston Court Road, Ramsgate, Kent
Council area (by location)
Thanet
Time to decision
10 weeks
REPD reference
1232

Who decides

ApplicationsThanetUK
Decided applications (solar, wind, battery)2710,236
Refused2 (7%)19%
Solar refused1 of 2012%
Battery storage refused1 of 716%
Median time from submission to decision10.7 weeks17.0 weeks
Appeals lodged / allowed0 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Manston Solar Farm extension (Westwood)solar farm9.2operational0.5
Land near Manstonsolar8.1refused0.9
Hengrove Farm, Shottendane Road Solar Farmsolar farm30approved, not built1.4
Thorne Farmsolar farm6.2operational2.0
Sacketts Hill Farmbattery storage22approved, not built3.0
Ebbsfleet Lanebattery storage49.9approved, not built3.9
Minster Abbey, Bedlam Court Lanesolar farm33under construction4.1
Richborough Energy Park - Phase 3 (Sheaf)battery storage249under construction4.7
Richborough Energy Park - Phase 2battery storage50.1operational4.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.3519, 1.3674).