Manston Solar Farm extension (Westwood) (9.2 MW)

Manston Solar Farm extension (Westwood) is a 9.2 MW solar farm project in Thanet, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 28 March 2014; the record was last updated on 2 April 2014.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

9.2 MWsolar farm
operationalstatus in REPD
2 April 2014record last updated
Thanetcouncil area

Planning timeline

DateStage
10 May 2013Application submitted
24 July 2013Planning permission granted
28 March 2014Operational

Project details

Technology
solar farm
Capacity
9.2 MW
Status (REPD)
operational
Record last updated
2 April 2014
Operator or applicant
Sunsave 16 Ltd/ Vogt Solar
Planning authority
Thanet
Planning application reference
F/TH/13/0315
Site area
12.2 ha
Address (REPD)
LAND TO SOUTH SIDE OF PRESTON ROAD RAMSGATE
Council area (by location)
Thanet
Time to decision
11 weeks
REPD reference
1359

Who decides

ApplicationsThanetUK
Decided applications (solar, wind, battery)2710,236
Refused2 (7%)19%
Solar refused1 of 2012%
Battery storage refused1 of 716%
Median time from submission to decision10.7 weeks17.0 weeks
Appeals lodged / allowed0 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Manston Solar Farmsolar farm9.9operational0.5
Land near Manstonsolar8.1refused1.1
Hengrove Farm, Shottendane Road Solar Farmsolar farm30approved, not built1.6
Thorne Farmsolar farm6.2operational2.4
Sacketts Hill Farmbattery storage22approved, not built2.6
Ebbsfleet Lanebattery storage49.9approved, not built4.1
Minster Abbey, Bedlam Court Lanesolar farm33under construction4.6
Richborough Energy Park - Phase 3 (Sheaf)battery storage249under construction4.8
Richborough Energy Parkbattery storage49.9operational5.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.3519, 1.3745).