Mitchells Industrial Park, Bradberry Balk Lane (26 MW battery storage)
Mitchells Industrial Park, Bradberry Balk Lane is a 26 MW battery storage project in Barnsley, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 17 June 2026; the record was last updated on 10 July 2026.
26 MWbattery storage
application withdrawnstatus in REPD
10 July 2026record last updated
Barnsleycouncil area
Planning timeline
| Date | Stage |
|---|---|
| 20 December 2024 | Application submitted |
| 17 June 2026 | Application withdrawn |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 26 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 10 July 2026
- Operator or applicant
- Mercia Power Response Limited
- Planning authority
- Barnsley
- Planning application reference
- 2024/1091
- Address (REPD)
- Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsley
- Council area (by location)
- Barnsley
- Name in REPD
- Mitchells Industrial Park, Bradberry Balk Lane - Battery Energy Storage
- REPD reference
- 18144
Who decides
| Applications | Barnsley | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 24 | 10,236 |
| Refused | 2 (8%) | 19% |
| Solar refused | 0 of 13 | 12% |
| Onshore wind refused | 2 of 6 | 45% |
| Battery storage refused | 0 of 5 | 16% |
| Median time from submission to decision | 21.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 1 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Barnsley Battery Energy Storage | battery storage | 40 | operational | 3.2 |
| Swangate Project | battery storage | 50 | approved, not built | 3.8 |
| West Melton Electricity Substation | battery storage | 26 | approved, not built | 4.0 |
| Park Spring Wind Farm | wind farm | 8.6 | operational | 4.7 |
| Engine Lane, Grimethorpe Solar Farm | solar farm | 49.9 | application submitted | 6.1 |
| Kirkgate Lane, Felkirk | solar farm | 10 | approved, not built | 8.6 |
| Manor Farm, South Hiendley Solar Photovoltaic Farm | solar farm | 30 | approved, not built | 9.2 |
| South Kirkby Business Park | battery storage | 10 | permission expired | 9.3 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.532, -1.4083).