Muchalls Jnct, Muchalls (6.1 MW solar farm)

Muchalls Jnct, Muchalls is a 6.1 MW solar farm project in Aberdeenshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 24 September 2025; the record was last updated on 2 December 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6.1 MWsolar farm
application withdrawnstatus in REPD
2 December 2025record last updated
Aberdeenshirecouncil area

Planning timeline

DateStage
20 June 2025Application submitted
24 September 2025Application withdrawn

Project details

Technology
solar farm
Capacity
6.1 MW
Status (REPD)
application withdrawn
Record last updated
2 December 2025
Operator or applicant
Decerna Limited
Planning authority
Aberdeenshire
Planning application reference
APP/2025/0874
Site area
10.4 ha
Address (REPD)
Nw/O A92 Muchalls Jnct, Muchalls, Newtonhill, Stonehaven
Council area (by location)
Aberdeenshire
Name in REPD
Muchalls Jnct, Muchalls - Solar Photovoltaic Array
REPD reference
19257

Who decides

ApplicationsAberdeenshireUK
Decided applications (solar, wind, battery)20010,236
Refused64 (32%)19%
Solar refused1 of 4012%
Onshore wind refused60 of 13245%
Battery storage refused3 of 2816%
Median time from submission to decision40.6 weeks17.0 weeks
Appeals lodged / allowed15 / 13—

Other large projects within 10 km

ProjectTypeMWStatuskm
Bankhead Recycling Solar Array, Battery Storage & Hydrogenbattery storage5approved, not built6.5
Rigifa Cove Roadbattery storage49.9approved, not built7.4
Meikle Carewewind farm10operational7.9
Craigneil Hillwind farm35approved, not built8.1
Tullo Farmwind farm17.5operational8.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.032, -2.1501).