Parks of Kellour Wind Farm (12 MW)

Parks of Kellour Wind Farm is a 12 MW wind farm project in Perth and Kinross, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 15 July 2015; the record was last updated on 5 August 2015.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

12 MWwind farm
refusedstatus in REPD
5 August 2015record last updated
Perth and Kinrosscouncil area

Planning timeline

DateStage
25 March 2015Application submitted
15 July 2015Refused by the planning authority

Project details

Technology
wind farm
Capacity
12 MW
Status (REPD)
refused
Record last updated
5 August 2015
Operator or applicant
SRL
Planning authority
Perth and Kinross
Planning application reference
15/00445/FLL
Turbines
4
Turbine height
125 m
Address (REPD)
Parks of Kellour Farm, Methven, Perth, Tayside
Council area (by location)
Perth and Kinross
Time to decision
16 weeks
REPD reference
5151

Who decides

ApplicationsPerth and KinrossUK
Decided applications (solar, wind, battery)7310,236
Refused32 (44%)19%
Solar refused6 of 2412%
Onshore wind refused23 of 3145%
Battery storage refused3 of 1816%
Median time from submission to decision28.3 weeks17.0 weeks
Appeals lodged / allowed7 / 8—

Other large projects within 10 km

ProjectTypeMWStatuskm
Logiealmondwind farm28application withdrawn5.6
Kinnon Park Farm, Methven Solar Farm & Battery Storagesolar farm49.9refused6.8
Solar Array at Dupplin Solar 750 Metres S/O Newbigging Farm Tibbermoresolar farm97.5application submitted7.3
Taigh An Struith, Tibbermorebattery storage49.9refused8.1
Mull Hill Windfarmwind farm22.5refused on appeal9.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.4153, -3.6566).