Quantans Hill Wind Farm (96 MW)

Quantans Hill Wind Farm is a 96 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 27 January 2023, no decision recorded; the record was last updated on 20 February 2023. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

96 MWwind farm
application submittedmay be out of datestatus in REPD
20 February 2023record last updated
Dumfries and Gallowaycouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
27 January 2023Application submitted

Project details

Technology
wind farm
Capacity
96 MW
Status (REPD)
application submitted
Record last updated
20 February 2023
Operator or applicant
Vattenfall Wind Power Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00003399
Turbines
14
Turbine height
200 m
Address (REPD)
Quantans Hill Wind Farm, Carsphairn, Castle Douglas
Council area (by location)
Dumfries and Galloway
REPD reference
13237

The scheme also includes 50 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Quantans Hill Wind Farmwind farm57application withdrawn2.3
Longburn Wind Farmwind farm23refused on appeal2.9
Shepherd's Rig Wind Farmwind farm81approved, not built6.2
Benbrack Wind Farmwind farm67.1operational6.8
Windy Standard III Wind Farm (Brockloch Rig Phase 2)wind farm87.6under construction7.2
Windy Rig Wind Farmwind farm43operational8.7
Brochloch Rig (formerly Windy Standard II)wind farm90operational9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.2125, -4.2626).