Sand Lane Solar Farm (20.2 MW)
Sand Lane Solar Farm is a 20.2 MW solar farm project in North Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 4 June 2025, no decision recorded; the record was last updated on 10 July 2025.
20.2 MWsolar farm
application submittedstatus in REPD
10 July 2025record last updated
North Lincolnshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 4 June 2025 | Application submitted |
Project details
- Technology
- solar farm
- Capacity
- 20.2 MW
- Status (REPD)
- application submitted
- Record last updated
- 10 July 2025
- Operator or applicant
- PS Renewables Limited
- Planning authority
- North Lincolnshire
- Planning application reference
- PA/2025/620
- Site area
- 32.4 ha
- Address (REPD)
- Sand Lane Solar Farm, West of Manton
- Council area (by location)
- North Lincolnshire
- REPD reference
- 17395
Who decides
| Applications | North Lincolnshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 47 | 10,236 |
| Refused | 15 (32%) | 19% |
| Solar refused | 7 of 33 | 12% |
| Onshore wind refused | 8 of 10 | 45% |
| Battery storage refused | 0 of 4 | 16% |
| Median time from submission to decision | 10.0 weeks | 17.0 weeks |
| Appeals lodged / allowed | 6 / 4 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Manton Manor Solar Farm | solar farm | 27 | refused on appeal | 1.8 |
| Raventhorpe Lodge (Sweeting Thorns) | solar farm | 25 | permission expired | 6.2 |
| Laughton Wind Farm | wind farm | 28 | refused on appeal | 6.8 |
| Raventhorpe Farm | solar farm | 38 | operational | 6.8 |
| Little Crow Solar Park | solar farm | 150 | approved, not built | 8.3 |
| Scawby Brook, Brigg | battery storage | 99 | approved, not built | 8.3 |
| Scawby Road | solar farm | 49.9 | application submitted | 9.0 |
| Brown's Holt Wind Farm | wind farm | 24 | application withdrawn | 9.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.5021, -0.6136).