Staughton Airfield Solar Farm (40 MW)

Staughton Airfield Solar Farm is a 40 MW solar farm project in Huntingdonshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 March 2020; the record was last updated on 16 January 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

40 MWsolar farm
operationalstatus in REPD
16 January 2026record last updated
Huntingdonshirecouncil area

Planning timeline

DateStage
18 June 2015Application submitted
28 September 2015Planning permission granted
1 March 2019Construction started
1 March 2020Operational

Project details

Technology
solar farm
Capacity
40 MW
Status (REPD)
operational
Record last updated
16 January 2026
Operator or applicant
GreenHedge (BayWa r.e.) / Next Energy Capital
Planning authority
Huntingdonshire
Planning application reference
15/00940/FUL
Site area
0.2 ha
Address (REPD)
Land At Top Farm and Little Stau, Airfield Industrial Estate, Little Staughton, Bedford, Bedfordshire
Council area (by location)
Huntingdonshire
Time to decision
15 weeks
REPD reference
5431

Who decides

ApplicationsHuntingdonshireUK
Decided applications (solar, wind, battery)4710,236
Refused7 (15%)19%
Solar refused1 of 3312%
Onshore wind refused6 of 1145%
Battery storage refused0 of 316%
Median time from submission to decision19.0 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Cobholden Battery Storagebattery storage100approved, not built1.2
East Park Energysolar farm400application submitted4.2
Cobholden Solar Farmsolar farm49.9approved, not built4.3
Manor Farm - Pertenhallsolar farm15operational5.2
Common Barn Wind Farmwind farm6.2operational6.3
Bicton Industrial Park, Stow Road Solar Farmsolar farm8approved, not built8.0
Vicarage Lane, Diddington Solar Arrayssolar farm35application submitted8.3
Rookery Farm Solar Farmsolar farm5.3operational8.7
Bicton Wind Farmwind farm9refused8.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.2419, -0.3596).