Stoneton Wind Farm (18 MW)
Stoneton Wind Farm is an 18 MW wind farm project in Stratford-on-Avon, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 9 May 2014; the record was last updated on 3 September 2014.
18 MWwind farm
application withdrawnstatus in REPD
3 September 2014record last updated
Stratford-on-Avoncouncil area
Planning timeline
| Date | Stage |
|---|---|
| 20 June 2012 | Application submitted |
| 9 May 2014 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 18 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 3 September 2014
- Operator or applicant
- EDF Energy Renewables
- Planning authority
- Stratford-on-Avon
- Planning application reference
- 12/01500/FUL
- Turbines
- 9
- Address (REPD)
- Land Running From The A423 South West Of Wormleighton To Land East And North East Of Wormleighton At Stoneton
- Council area (by location)
- Stratford-on-Avon
- REPD reference
- 4416
Who decides
| Applications | Stratford-on-Avon | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 45 | 10,236 |
| Refused | 8 (18%) | 19% |
| Solar refused | 5 of 36 | 12% |
| Onshore wind refused | 1 of 1 | 45% |
| Battery storage refused | 2 of 8 | 16% |
| Median time from submission to decision | 18.0 weeks | 17.0 weeks |
| Appeals lodged / allowed | 6 / 4 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Feldon Vale Solar Farm | solar farm | 49.9 | approved, not built | 6.4 |
| Feldon Vale Solar Farm | solar farm | 49.9 | operational | 6.4 |
| Dadglow Farm, Bishops Itchington | battery storage | 20 | refused | 7.2 |
| Starbold Wind Farm | wind farm | 15 | refused on appeal | 7.2 |
| Deppers Bridge | solar | 9 | refused | 8.0 |
| The Elms | solar farm | 10.4 | operational | 8.2 |
| Eastfields Farm, Deppers Bridge Solar Farm | solar farm | 34.8 | under construction | 8.8 |
| Solar Farm at Fields Farm (Phase 1) | solar farm | 5 | operational | 8.9 |
| Hanwell Estate, Main Street Solar Farm | solar farm | 40 | application submitted | 9.6 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.1768, -1.3422).