Swift Wind Farm (8 MW)
Swift Wind Farm is an 8 MW wind farm project in Harborough, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 14 March 2016; the record was last updated on 14 March 2016.
8 MWwind farm
application withdrawnstatus in REPD
14 March 2016record last updated
Harboroughcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 22 April 2015 | Application submitted |
| 14 March 2016 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 8 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 14 March 2016
- Operator or applicant
- Renewable Energy Systems (RES)
- Planning authority
- Rugby
- Planning application reference
- R15/0908
- Turbines
- 4
- Turbine height
- 127 m
- Address (REPD)
- Cestersover Farm, Lutterworth Road, Churchover, Pailton, Rugby, Warwickshire
- Council area (by location)
- Harborough
- REPD reference
- 5221
Who decides
| Applications | Rugby | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 25 | 10,236 |
| Refused | 3 (12%) | 19% |
| Solar refused | 1 of 18 | 12% |
| Onshore wind refused | 2 of 2 | 45% |
| Battery storage refused | 0 of 5 | 16% |
| Median time from submission to decision | 12.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 1 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| School Farm | solar farm | 12 | refused | 1.1 |
| Swift Wind Farm (Bransford Bridge) | wind farm | 8 | refused on appeal | 1.3 |
| Streetfield Farm | solar farm | 18.3 | operational | 1.3 |
| Northfield House Solar Farm | solar farm | 26 | operational | 1.6 |
| Harborough Fields Farm | solar farm | 27 | permission expired | 2.3 |
| Bransford Bridge | wind farm | 18 | refused | 2.3 |
| Energy Park Facility & Battery Storage | battery storage | 1,000 | application submitted | 5.4 |
| Swinford Wind Farm | wind farm | 22 | operational | 5.5 |
| Swinford Wind Farm | solar farm | 20 | under construction | 5.5 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.4345, -1.2378).