Trentworthy Solar Farm (5 MW)

Trentworthy Solar Farm is a 5 MW solar farm project in Torridge, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 20 April 2011; the record was last updated on 24 August 2011.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWsolar farm
application withdrawnstatus in REPD
24 August 2011record last updated
Torridgecouncil area

Planning timeline

DateStage
4 January 2011Application submitted
20 April 2011Application withdrawn

Project details

Technology
solar farm
Capacity
5 MW
Status (REPD)
application withdrawn
Record last updated
24 August 2011
Operator or applicant
Private Developer
Planning authority
Torridge
Planning application reference
1/1132/2010/FULM
Site area
18.1 ha
Address (REPD)
Youlstone, Holsworthy, Devon
Council area (by location)
Torridge
REPD reference
1036

Who decides

ApplicationsTorridgeUK
Decided applications (solar, wind, battery)4510,236
Refused12 (27%)19%
Solar refused4 of 3112%
Onshore wind refused6 of 845%
Battery storage refused2 of 616%
Median time from submission to decision24.1 weeks17.0 weeks
Appeals lodged / allowed3 / 7—

Other large projects within 10 km

ProjectTypeMWStatuskm
Chester Energy (East Woolley Farm)solar farm5operational3.6
Harbourcross wind farmwind farm10refused3.7
East Langford Farmsolar farm5operational4.6
Wheelers Crosswind farm7.8refused6.0
Walland Farmsolar farm5operational9.7
Pitworthy Farm Solar Parksolar farm15.6operational10.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.9107, -4.4385).