Wind Farm at Meall Dearg Wind Farm (147 MW)

Wind Farm at Meall Dearg Wind Farm is a 147 MW wind farm project in Perth and Kinross, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 11 August 2025, no decision recorded; the record was last updated on 13 October 2025. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

147 MWwind farm
application submittedstatus in REPD
13 October 2025record last updated
Perth and Kinrosscouncil area

Planning timeline

DateStage
11 August 2025Application submitted

Project details

Technology
wind farm
Capacity
147 MW
Status (REPD)
application submitted
Record last updated
13 October 2025
Operator or applicant
Energiekontor (UK) Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00006049
Turbines
21
Turbine height
250 m
Address (REPD)
Meall Dearg Wind Farm, 6km S/O Aberfeldy, Perth
Council area (by location)
Perth and Kinross
Name in REPD
Meall Dearg Wind Farm - Wind Farm
REPD reference
18494

The scheme also includes battery storage, recorded separately in REPD (application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
North Calliachar Wind Farmwind farm21abandoned4.2
Creag A Bhairdwind farm29.9refused on appeal4.8
Griffin Wind farmwind farm156operational6.7
Crossburns Wind Farmwind farm75refused on appeal7.1
Calliacharwind farm32.2operational9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.5469, -3.8226).