Renewable energy projects in Brentwood

10 solar, wind or battery projects of 150 kW or more are located in Brentwood (REPD, July 2026 extract): 0 pending, 5 approved but not running, 3 operational and 1 refused.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10projects in the council area
0awaiting a decision
5approved, not running
3operational

How Brentwood decides

Brentwood has 9 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Projects in Brentwood

Projects of 1 MW and more (7)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updated
Brentwood nergy Storage Systembattery storagebattery storage49.9approved, not built may be out of dateupdated Jul 2022Dec 2020granted May 2021Jul 2022
Crouch Solar Farmsolar farmsolar farm49.9operationalupdated Oct 2024May 2021granted Dec 2021Oct 2024
Crouch Solar Farmbattery storagebattery storage49.9operationalupdated Oct 2024May 2021granted Dec 2021Oct 2024
Solar Farm at Billericay Solar Farm North Of Rayleigh Road Huttonsolar farmsolar farm15approved, not builtupdated Nov 2025Nov 2024granted Apr 2025Nov 2025
Hutton Battery Storage (Lower Road)battery storagebattery storage10operationalupdated Mar 2026Sep 2017granted Dec 2017Mar 2026
Ongar Landfill Ground mounted solar photovoltaicsolar farmsolar farm8.8application withdrawnupdated May 2022Feb 2021—May 2022
Land at Havering Grove Farmsolar farmsolar farm5refused on appealupdated May 2016Feb 2015refused Jun 2015May 2016
Smaller schemes under 1 MW, mostly rooftop solar (3)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updated
Peri Limited, Greenways Solar Photovoltaicsrooftop solarrooftop solar0.5approved, not builtupdated Jan 2023Nov 2022granted Dec 2022Jan 2023
The Marillac, Eagle Wayrooftop solarrooftop solar0.2approved, not builtupdated Jul 2025Apr 2025granted Jun 2025Jul 2025
Langford Bridge Farm, Ongar Roadrooftop solarrooftop solar0.2approved, not builtupdated Feb 2025Dec 2024granted Feb 2025Feb 2025

Postcode districts in Brentwood

DistrictProjects within 10 kmPendingApprovedOperational
CM4201115
CM134041912
CM143331610
CM15210116

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Projects belong to Brentwood by location (nearest postcode to the REPD grid reference); decisions are counted by the planning authority named in REPD.