Ongar Landfill Ground mounted solar photovoltaic (8.8 MW)

Ongar Landfill Ground mounted solar photovoltaic is an 8.8 MW solar farm project in Brentwood, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 21 September 2021; the record was last updated on 3 May 2022.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8.8 MWsolar farm
application withdrawnstatus in REPD
3 May 2022record last updated
Brentwoodcouncil area

Planning timeline

DateStage
22 February 2021Application submitted
21 September 2021Application withdrawn

Project details

Technology
solar farm
Capacity
8.8 MW
Status (REPD)
application withdrawn
Record last updated
3 May 2022
Operator or applicant
Infinis
Planning authority
Brentwood
Planning application reference
ESS/21/21/BRW
Address (REPD)
Ongar Landfill, Mill Lane, High Ongar
Council area (by location)
Brentwood
REPD reference
8428

Who decides

Brentwood has 9 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Other large projects within 10 km

ProjectTypeMWStatuskm
Solar Farm at Nickerlandssolar farm25approved, not built4.6
Thrift Solar Farm and BESSsolar farm30approved, not built6.4
Solar Farm at Billericay Solar Farm North Of Rayleigh Road Huttonsolar farm15approved, not built8.8
Hutton Battery Storage (Lower Road)battery storage10operational9.4
Brentwood nergy Storage Systembattery storage49.9approved, not built9.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.6964, 0.2596).