Energy Projects Near You

Solar, wind and battery projects near Doncaster (DN12)

47 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of DN12 (Doncaster): 11 are waiting for a planning decision, 27 approved but not yet running, 4 operational. The largest live scheme is Moat Lane, Wickersley (100 MW battery storage, approved on 19 November 2025, not yet built), 8.9 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

47projects within 10 km
11awaiting a decision
27approved, not running
4operational

Projects within 10 km of DN12

Projects of 1 MW and more (27)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Firsby Lane, Hooton Robertssolar farmsolar farm13.5application submittedupdated May 2026May 2026—May 2026Doncaster3.0
Doncaster Road, Doncaster Roadsolar farmsolar farm1approved, not built may be out of dateupdated Jul 2023Dec 2022granted Jun 2023Jul 2023Doncaster3.4
Mere Flats Solar Farmsolar farmsolar farm56approved, not built may be out of dateupdated Feb 2026Aug 2022granted May 2023Feb 2026Doncaster4.7
Mere Flats Solar Farmbattery storagebattery storage16application submitted may be out of dateupdated Feb 2026Aug 2022—Feb 2026Doncaster4.7
Marr Windfarmwind farmwind farm8operationalupdated Mar 2012Dec 2006granted Jul 2007Mar 2012Doncaster5.7
Marr Hall Farm, Barnsley Road Solar Farmsolar farmsolar farm40refusedupdated Jan 2026Jan 2024refused Dec 2025Jan 2026Doncaster6.5
J3 Business Parkbattery storagebattery storage10under constructionupdated Jul 2024Oct 2022granted Jan 2023Jul 2024Doncaster6.7
J3 Business Parkbattery storagebattery storage16approved, not built may be out of dateupdated Jun 2023May 2023granted Jul 2023Jun 2023Doncaster6.7
Brookfields Park, Brookfields Driverooftop solarrooftop solar1.1approved, not builtupdated Sep 2024Apr 2024granted Jun 2024Sep 2024Rotherham6.8
Brookfields Park, Brookfields Driverooftop solarrooftop solar1.1approved, not builtupdated Sep 2024Apr 2024granted Jun 2024Sep 2024Rotherham6.8
Toronto Way, New Rossington Solar Panelsrooftop solarrooftop solar2.3approved, not built may be out of dateupdated Feb 2023Feb 2021granted Apr 2021Feb 2023Doncaster7.6
Aven Industrial Estatebattery storagebattery storage20permission expiredupdated Jun 2020Jun 2017granted Jun 2018Jun 2020Rotherham7.7
Meadows Road, Manversrooftop solarrooftop solar2.1application submitted may be out of dateupdated Feb 2022Feb 2022—Feb 2022Rotherham7.7
Amazon LBA2 (Principal Place)rooftop solarrooftop solar2permission expiredupdated Feb 2020Jul 2018granted Mar 2019Feb 2020Doncaster8.0
Goldthorperooftop solarrooftop solar1.5operationalupdated Jun 2014May 2013granted Jul 2013Jun 2014Barnsley8.0
Iport Avenue, New Rossington Solar Panelsrooftop solarrooftop solar1.9approved, not built may be out of dateupdated May 2021Feb 2021granted Mar 2021May 2021Doncaster8.3
Cutts Bros, Wharf Roadbattery storagebattery storage50approved, not builtupdated Nov 2024May 2024granted Oct 2024Nov 2024Doncaster8.3
Moat Lane, Wickersleybattery storagebattery storage100approved, not builtupdated Dec 2025Jul 2023granted Nov 2025Dec 2025Rotherham8.9
Moat Lane, Wickersleybattery storagebattery storage100approved, not builtupdated Dec 2025Feb 2024granted Nov 2025Dec 2025Rotherham9.0
Long Lands Lanebattery storagebattery storage12abandonedupdated Feb 2019Oct 2017—Feb 2019Doncaster9.2
Woodlandsbattery storagebattery storage1.2approved, not built may be out of dateupdated Jul 2022Mar 2022granted Jul 2022Jul 2022Doncaster9.2
Green Lane, Thurcroftbattery storagebattery storage85approved, not built may be out of dateupdated May 2023Nov 2022granted May 2023May 2023Rotherham9.4
Thurcroft Interchange Energy Parkbattery storagebattery storage50application submittedupdated Jul 2025Jun 2025—Jul 2025Rotherham9.4
Thurcroft Interchange Energy Park Solar Farmsolar farmsolar farm49.9application submittedupdated Jul 2025Jun 2025—Jul 2025Rotherham9.4
Nether Moor Fieldbattery storagebattery storage49.9operationalupdated May 2020Sep 2017granted Dec 2017May 2020Rotherham9.5
Butt Lane, Hooton Pagnell Solar Farmsolar farmsolar farm49.9application submittedupdated Jan 2026Dec 2025—Jan 2026Doncaster9.8
Butt Lane, Hooton Pagnell Battery Energy Storagebattery storagebattery storage30application submittedupdated Jan 2026Dec 2025—Jan 2026Doncaster9.8
Smaller schemes under 1 MW, mostly rooftop solar (20)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
De Warenne Academy, Gardens Lanerooftop solarrooftop solar0.2approved, not builtupdated Dec 2025Oct 2025granted Dec 2025Dec 2025Doncaster1.0
Eland House, Denabyrooftop solarrooftop solar0.3application submitted may be out of dateupdated May 2022Apr 2022—May 2022Doncaster2.6
Red House Solar Panelsrooftop solarrooftop solar0.1approved, not builtupdated Nov 2022Jul 2021granted Sep 2021Nov 2022Doncaster3.4
Red House Farm, High Melton -Solar Panelsrooftop solarrooftop solar0.2approved, not builtupdated Nov 2022May 2022granted Sep 2022Nov 2022Doncaster3.4
Thrybergh Hydroelectric Schemebattery storagebattery storage0.3operationalupdated Feb 2019Nov 2016—Feb 2019Rotherham5.7
Pearsons Assessment And Testing, Hellaby Ind Estaterooftop solarrooftop solar0.2approved, not builtupdated Jan 2023Nov 2022granted Jan 2023Jan 2023Rotherham6.3
Bluetree Group, Brookfields Parkrooftop solarrooftop solar—application submitted may be out of dateupdated Nov 2022Oct 2022—Nov 2022Rotherham6.6
Maltby Sports Centre, Maltbyrooftop solarrooftop solar0.5approved, not builtupdated Nov 2025Aug 2025granted Oct 2025Nov 2025Rotherham6.7
Morris & Co Handlers, Balby Carr Bankrooftop solarrooftop solar0.6approved, not built may be out of dateupdated Apr 2023Feb 2023granted Apr 2023Apr 2023Doncaster6.7
Morris And Co Handlers, Balby Carr Bankrooftop solarrooftop solar0.3approved, not builtupdated Jan 2024Nov 2023granted Jan 2024Jan 2024Doncaster6.7
Aven Industrial Park, Tickhill Roadbattery storagebattery storage—approved, not built may be out of dateupdated Feb 2023Aug 2022granted Sep 2022Feb 2023Rotherham7.6
Maltby / CLNR EES1battery storagebattery storage0.1decommissionedupdated Oct 2016May 2005—Oct 2016Rotherham7.7
Don Valley Academy, Jossey Lanerooftop solarrooftop solar0.3approved, not builtupdated Jan 2026Oct 2025granted Dec 2025Jan 2026Doncaster7.8
Bluetree Group, Brookfields Park Solar Photovoltaics Equipmentrooftop solarrooftop solar—approved, not builtupdated Dec 2022Oct 2022granted Dec 2022Dec 2022Rotherham8.3
Premier Logistics Park, Churchill Roadrooftop solarrooftop solar—approved, not builtupdated Mar 2026Dec 2025granted Feb 2026Mar 2026Doncaster8.5
Aldwarke Lane - Ground Mounted Solar Arraysolar farmsolar farm0.8application submitted may be out of dateupdated Jun 2023Jun 2023—Jun 2023Rotherham8.6
Moat Barn, Moat Lanesolar farmsolar farm—approved, not builtupdated Jul 2025Apr 2024refused Aug 2024Jul 2025Rotherham8.9
Battery Energy Storage Systembattery storagebattery storage—approved, not builtupdated Mar 2026Nov 2025granted Jan 2026Mar 2026Rotherham9.4
Ron Hull Junior, Mangham Roadrooftop solarrooftop solar0.2approved, not builtupdated Aug 2025Jun 2025granted Aug 2025Aug 2025Rotherham9.4
Bauer Equipment, Rotary Driverooftop solarrooftop solar—application submitted may be out of dateupdated Jul 2023Jul 2023—Jul 2023Rotherham9.6

Distance from the average position of the DN12 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm84301171
Rooftop solar214151011.5
Wind farm100100
Battery storage173920458

MW in pipeline: pending, approved and under-construction capacity.

How Doncaster decides solar, wind and battery applications

ApplicationsDoncasterUK
Decided applications (solar, wind, battery)4310,236
Refused3 (7%)19%
Solar refused1 of 2712%
Onshore wind refused1 of 545%
Battery storage refused1 of 1116%
Median time from submission to decision17.0 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

All projects in Doncaster

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near DN12, 15 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.