Butt Lane, Hooton Pagnell Solar Farm (49.9 MW)

Butt Lane, Hooton Pagnell Solar Farm is a 49.9 MW solar farm project in Doncaster, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 5 December 2025, no decision recorded; the record was last updated on 9 January 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
application submittedstatus in REPD
9 January 2026record last updated
Doncastercouncil area

Planning timeline

DateStage
5 December 2025Application submitted

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
application submitted
Record last updated
9 January 2026
Operator or applicant
British Solar Renewables
Planning authority
Doncaster
Planning application reference
25/02389/FULM
Site area
94.0 ha
Address (REPD)
Butt Lane, Hooton Pagnell, Doncaster
Council area (by location)
Doncaster
Name in REPD
Butt Lane, Hooton Pagnell - Solar Farm
REPD reference
19248

Recorded together with Butt Lane, Hooton Pagnell Battery Energy Storage (30 MW battery storage, application submitted).

Who decides

ApplicationsDoncasterUK
Decided applications (solar, wind, battery)4310,236
Refused3 (7%)19%
Solar refused1 of 2712%
Onshore wind refused1 of 545%
Battery storage refused1 of 1116%
Median time from submission to decision17.0 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Hampole Wind Farmwind farm8operational1.4
Moorhouse Grange, Moorhouse Lane Solar Farmsolar farm30application submitted2.3
Long Lands Lanebattery storage12abandoned3.8
Marr Hall Farm, Barnsley Road Solar Farmsolar farm40refused4.1
Marr Windfarmwind farm8operational4.2
South Kirkby Business Parkbattery storage10permission expired5.6
Norton Community Wind Turbineswind farm5refused7.9
Engine Lane, Grimethorpe Solar Farmsolar farm49.9application submitted8.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.567, -1.2676).