Hampole Wind Farm (8 MW)
Hampole Wind Farm is an 8 MW wind farm project in Doncaster, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 31 March 2014; the record was last updated on 24 October 2018.
8 MWwind farm
operationalstatus in REPD
24 October 2018record last updated
Doncastercouncil area
Planning timeline
| Date | Stage |
|---|---|
| 9 September 2008 | Application submitted |
| 17 December 2009 | Planning permission granted |
| 17 June 2013 | Construction started |
| 31 March 2014 | Operational |
Project details
- Technology
- wind farm
- Capacity
- 8 MW
- Status (REPD)
- operational
- Record last updated
- 24 October 2018
- Operator or applicant
- Good Energy (previously nPower Renewables)
- Planning authority
- Doncaster
- Planning application reference
- 08/02695/FULA
- Turbines
- 4
- Address (REPD)
- Land Near Hampole Wood Hampole Doncaster
- Council area (by location)
- Doncaster
- Time to decision
- 66 weeks
- REPD reference
- 3957
Who decides
| Applications | Doncaster | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 43 | 10,236 |
| Refused | 3 (7%) | 19% |
| Solar refused | 1 of 27 | 12% |
| Onshore wind refused | 1 of 5 | 45% |
| Battery storage refused | 1 of 11 | 16% |
| Median time from submission to decision | 17.0 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Moorhouse Grange, Moorhouse Lane Solar Farm | solar farm | 30 | application submitted | 1.3 |
| Butt Lane, Hooton Pagnell Solar Farm | solar farm | 49.9 | application submitted | 1.4 |
| Butt Lane, Hooton Pagnell Battery Energy Storage | battery storage | 30 | application submitted | 1.4 |
| Long Lands Lane | battery storage | 12 | abandoned | 3.2 |
| Marr Hall Farm, Barnsley Road Solar Farm | solar farm | 40 | refused | 4.5 |
| Marr Windfarm | wind farm | 8 | operational | 4.9 |
| South Kirkby Business Park | battery storage | 10 | permission expired | 5.6 |
| Norton Community Wind Turbines | wind farm | 5 | refused | 6.5 |
| Askern Colliery solar farm | solar farm | 5 | operational | 8.0 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.5766, -1.255).