Energy Projects Near You

Solar, wind and battery projects near Brecon (LD3)

2 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of LD3 (Powys): 1 approved but not yet running. The largest live scheme is Ffrwdgrech Industrial Estate (0.2 MW rooftop solar, approved on 28 March 2024, not yet built), 3.6 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

2projects within 10 km
0awaiting a decision
1approved, not running
0operational

Projects within 10 km of LD3

Projects of 1 MW and more (1)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Llethercynnon Farm Wind Farmwind farmwind farm7.1refusedupdated Mar 2005Apr 2000refused Jan 2003Mar 2005Powys6.1
Smaller schemes under 1 MW, mostly rooftop solar (1)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Ffrwdgrech Industrial Estaterooftop solarrooftop solar0.2approved, not builtupdated Apr 2024Aug 2023granted Mar 2024Apr 2024Powys3.6

Distance from the average position of the LD3 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Rooftop solar101000.2
Wind farm100010

MW in pipeline: pending, approved and under-construction capacity.

How Powys decides solar, wind and battery applications

ApplicationsPowysUK
Decided applications (solar, wind, battery)4210,236
Refused15 (36%)19%
Solar refused2 of 1512%
Onshore wind refused12 of 2445%
Battery storage refused1 of 316%
Median time from submission to decision78.6 weeks17.0 weeks
Appeals lodged / allowed5 / 3—

UK: all UK planning authorities. Counted under these REPD planning authority names: DECC (S36), Powys.

All projects in Powys

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Check the council's planning register for the latest decision.