Energy Projects Near You

Solar, wind and battery projects near Betws-Y-Coed (LL24)

3 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of LL24 (Conwy): 2 operational. The largest scheme is Moel Rhiwlug Wind Farm (19.2 MW wind farm, application withdrawn on 13 March 2003), 8.2 km away. Offshore, 1 wind farm is recorded within 40 km; the nearest is Rhyl Flats (90 MW, operational), 36.9 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

3projects within 10 km
0awaiting a decision
0approved, not running
2operational

Projects within 10 km of LL24

Projects of 1 MW and more (3)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Moel Rhiwlug Wind Farmwind farmwind farm19.2application withdrawnupdated Mar 2003——Mar 2003Conwy8.2
Moel Maelogen A Phase 2wind farmwind farm11.7operationalupdated May 2017Jun 2003granted Nov 2004May 2017Conwy9.6
Moel Maelogen Awind farmwind farm2.6operationalupdated Mar 2010Aug 1999granted Dec 1999Mar 2010Conwy9.6

Distance from the average position of the LL24 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Wind farm300200

MW in pipeline: pending, approved and under-construction capacity.

Offshore wind farms within 40 km

Wind farmMWStatus (REPD)km
Rhyl Flats90operationalupdated Aug 201736.9

Operational, approved and pending offshore wind farms; distance from the district centre to the REPD grid reference of each wind farm (one point per site, so the nearest turbines can be closer or further). All offshore wind farms in UK waters.

How Conwy decides solar, wind and battery applications

ApplicationsConwyUK
Decided applications (solar, wind, battery)1210,236
Refused5 (42%)19%
Solar refused0 of 112%
Onshore wind refused5 of 1045%
Battery storage refused0 of 116%
Median time from submission to decision31.3 weeks17.0 weeks
Appeals lodged / allowed1 / 0—

All projects in Conwy

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Check the council's planning register for the latest decision.