Moel Rhiwlug Wind Farm (19.2 MW)
Moel Rhiwlug Wind Farm is a 19.2 MW wind farm project in Conwy, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 13 March 2003; the record was last updated on 13 March 2003.
19.2 MWwind farm
application withdrawnstatus in REPD
13 March 2003record last updated
Conwycouncil area
Planning timeline
| Date | Stage |
|---|---|
| 13 March 2003 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 19.2 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 13 March 2003
- Operator or applicant
- MANWEB Generation Holdings Ltd/ National Windpower
- Planning authority
- Conwy
- Planning application reference
- not recorded
- Address (REPD)
- Moel Rhiwlug Pentrefoelas Clwyd
- Council area (by location)
- Conwy
- REPD reference
- 2581
Who decides
| Applications | Conwy | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 12 | 10,236 |
| Refused | 5 (42%) | 19% |
| Solar refused | 0 of 1 | 12% |
| Onshore wind refused | 5 of 10 | 45% |
| Battery storage refused | 0 of 1 | 16% |
| Median time from submission to decision | 31.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 1 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Llyn Alwen Wind Farm | wind farm | 19.3 | application withdrawn | 2.5 |
| Llys Dymper Wind Farm | wind farm | 23 | appeal withdrawn | 3.5 |
| Moel Maelogen A Phase 2 | wind farm | 11.7 | operational | 6.9 |
| Pant y Maen | wind farm | 17.5 | approved, not built | 9.3 |
| Cwmpenanner | wind farm | 24.2 | refused | 9.6 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.0832, -3.6706).