Llyn Alwen Wind Farm (19.3 MW)

Llyn Alwen Wind Farm is a 19.3 MW wind farm project in Conwy, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 10 May 2002; the record was last updated on 10 May 2002.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

19.3 MWwind farm
application withdrawnstatus in REPD
10 May 2002record last updated
Conwycouncil area

Planning timeline

DateStage
10 May 2002Application withdrawn

Project details

Technology
wind farm
Capacity
19.3 MW
Status (REPD)
application withdrawn
Record last updated
10 May 2002
Operator or applicant
MANWEB Generation Holdings/ National Windpower
Planning authority
Conwy
Planning application reference
not recorded
Address (REPD)
Llyn Alwen Pentrefoelas Clwyd
Council area (by location)
Conwy
REPD reference
2580

Who decides

ApplicationsConwyUK
Decided applications (solar, wind, battery)1210,236
Refused5 (42%)19%
Solar refused0 of 112%
Onshore wind refused5 of 1045%
Battery storage refused0 of 116%
Median time from submission to decision31.3 weeks17.0 weeks
Appeals lodged / allowed1 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Moel Rhiwlug Wind Farmwind farm19.2application withdrawn2.5
Llys Dymper Wind Farmwind farm23appeal withdrawn3.0
Pant y Maenwind farm17.5approved, not built6.8
Moel Maelogen A Phase 2wind farm11.7operational7.4
Gorsedd Brân Wind Framwind farm35refused on appeal8.1
Brenig Wind Farmwind farm37.6operational9.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.0944, -3.6382).