Gorsedd Brân Wind Fram (35 MW)
Gorsedd Brân Wind Fram is a 35 MW wind farm project in Denbighshire, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 18 November 2009; the record was last updated on 3 May 2010.
35 MWwind farm
refused on appealstatus in REPD
3 May 2010record last updated
Denbighshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 31 May 2007 | Application submitted |
| 12 February 2008 | Refused by the planning authority |
| 18 November 2009 | Appeal refused |
Project details
- Technology
- wind farm
- Capacity
- 35 MW
- Status (REPD)
- refused on appeal
- Record last updated
- 3 May 2010
- Operator or applicant
- Tegni Cymru Cyf
- Planning authority
- Denbighshire
- Planning application reference
- 25/2007/0642
- Turbines
- 13
- Address (REPD)
- Clocaenog forest, Denbighshire
- Council area (by location)
- Denbighshire
- Time to decision
- 37 weeks
- REPD reference
- 3052
Who decides
| Applications | Denbighshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 10 | 10,236 |
| Refused | 3 (30%) | 19% |
| Solar refused | 0 of 2 | 12% |
| Onshore wind refused | 3 of 7 | 45% |
| Battery storage refused | 0 of 1 | 16% |
| Median time from submission to decision | 39.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 2 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Pant y Maen | wind farm | 17.5 | approved, not built | 1.7 |
| Brenig Wind Farm | wind farm | 37.6 | operational | 3.2 |
| Tir Mostyn And Foel Goch Wind Farm | wind farm | 21.3 | operational | 3.3 |
| Clocaenog Forest Wind Farm | wind farm | 96 | operational | 7.4 |
| Llyn Alwen Wind Farm | wind farm | 19.3 | application withdrawn | 8.1 |
| Llys Dymper Wind Farm | wind farm | 23 | appeal withdrawn | 9.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.1318, -3.5335).