Solar, wind and battery projects near Milton Keynes (MK15)
94 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of MK15 (Milton Keynes): 4 are waiting for a planning decision, 60 approved but not yet running, 13 operational. The largest live scheme is Brogborough Landfill, Lidlington Solar PV park (40 MW solar farm, approved on 23 April 2024, not yet built), 9.7 km away. Source: Renewable Energy Planning Database, July 2026 extract.
Projects within 10 km of MK15
Projects of 1 MW and more (17)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Mercedes Benz UK Solar array car portrooftop solar | rooftop solar | 2 | approved, not built may be out of dateupdated Dec 2021 | Jun 2021 | granted Sep 2021 | Dec 2021 | Milton Keynes | 0.8 |
| Chippenham Drive, Kingstonrooftop solar | rooftop solar | 1.8 | approved, not builtupdated Jul 2024 | May 2024 | granted Jul 2024 | Jul 2024 | Milton Keynes | 3.9 |
| The Kicklessolar farm | solar farm | 5 | operationalupdated Apr 2016 | May 2014 | granted Nov 2014 | Apr 2016 | Milton Keynes | 4.4 |
| Orchard Way Wind Farmwind farm | wind farm | 15 | refused on appealupdated Aug 2014 | Sep 2011 | refused Nov 2012 | Aug 2014 | Milton Keynes | 5.1 |
| Harvie Card Wayrooftop solar | rooftop solar | 2 | operationalupdated Dec 2021 | Jun 2021 | granted Oct 2021 | Dec 2021 | Milton Keynes | 5.4 |
| DHL Supply Chain, Pendeen Crescent -Solar Panelsrooftop solar | rooftop solar | 1.2 | approved, not builtupdated Aug 2024 | Jun 2024 | granted Jul 2024 | Aug 2024 | Milton Keynes | 8.0 |
| Cranfield Airfieldsolar farm | solar farm | 1 | operationalupdated Jan 2019 | Oct 2017 | granted May 2020 | Jan 2019 | Central Bedfordshire | 8.2 |
| Pendeen Crescent, Snelshall Eastrooftop solar | rooftop solar | 1.2 | application submitted may be out of dateupdated Apr 2024 | Apr 2024 | — | Apr 2024 | Milton Keynes | 8.2 |
| Stoke Heights Wind Farmwind farm | wind farm | 30 | application withdrawnupdated Feb 2018 | Jun 2011 | — | Feb 2018 | Milton Keynes | 8.6 |
| Delico, Steinbeck Crescentrooftop solar | rooftop solar | 1.6 | approved, not built may be out of dateupdated May 2023 | Jan 2023 | granted Apr 2023 | May 2023 | Milton Keynes | 8.6 |
| Milton Keynes Wind Farmwind farm | wind farm | 14 | operationalupdated Dec 2017 | Aug 2006 | granted Jan 2008 | Dec 2017 | Milton Keynes | 8.9 |
| Oaks Farm Solar Farmsolar farm | solar farm | 37 | approved, not builtupdated Jul 2026 | Jul 2025 | granted May 2026 | Jul 2026 | Buckinghamshire | 9.1 |
| Rectory Farm/Embertonsolar farm | solar farm | 9 | operationalupdated Apr 2015 | Feb 2014 | granted Sep 2014 | Apr 2015 | Milton Keynes | 9.2 |
| Littlewood Farmsolar farm | solar farm | 14 | operationalupdated Aug 2015 | Jun 2014 | granted Oct 2014 | Aug 2015 | Milton Keynes | 9.3 |
| Knotwood Fields Farmsolar farm | solar farm | 2.6 | permission expiredupdated Aug 2019 | Sep 2015 | granted Dec 2015 | Aug 2019 | West Northamptonshire | 9.7 |
| Brogborough Landfill, Lidlington Solar PV parksolar farm | solar farm | 40 | approved, not builtupdated Feb 2026 | Mar 2022 | granted Apr 2024 | Feb 2026 | Central Bedfordshire | 9.7 |
| Brogborough Landfill Sitewind farm | wind farm | 5.4 | refusedupdated Aug 2014 | Mar 2014 | refused Jul 2014 | Aug 2014 | Central Bedfordshire | 9.9 |
Smaller schemes under 1 MW, mostly rooftop solar (60)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| David Lloyd, Livingstone Driverooftop solar | rooftop solar | 0.6 | approved, not builtupdated Nov 2023 | Sep 2023 | granted Nov 2023 | Nov 2023 | Milton Keynes | 0.5 |
| Brickhill Street, Lakeside Roundabout - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2025 | May 2025 | granted Jul 2025 | Nov 2025 | Milton Keynes | 0.7 |
| Delaware Drive, Tongwellrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jan 2025 | Oct 2024 | granted Nov 2024 | Jan 2025 | Milton Keynes | 1.3 |
| Northfield Drive, Northfield Solar Panlesrooftop solar | rooftop solar | 0.8 | approved, not builtupdated Feb 2022 | Feb 2022 | granted Mar 2022 | Feb 2022 | Milton Keynes | 1.5 |
| Northfield Drive, Tongwell Street - Micro Energy Storage Systembattery storage | battery storage | 0.2 | approved, not builtupdated Apr 2025 | Dec 2024 | granted Feb 2025 | Apr 2025 | Milton Keynes | 1.5 |
| Yeomans Drive, Blakelands - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated May 2025 | Jan 2025 | granted Mar 2025 | May 2025 | Milton Keynes | 1.7 |
| Northfield Drive, Northfield Driverooftop solar | rooftop solar | 0.3 | approved, not builtupdated Apr 2024 | Feb 2024 | granted Mar 2024 | Apr 2024 | Milton Keynes | 1.8 |
| St Leger Drive, Great Linford - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated Apr 2025 | Nov 2024 | granted Feb 2025 | Apr 2025 | Milton Keynes | 1.9 |
| Linford Wood Business Park, Linford Woodrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Apr 2024 | Feb 2024 | granted Mar 2024 | Apr 2024 | Milton Keynes | 2.0 |
| Caldecote Farm - Storage & Distribution Unitrooftop solar | rooftop solar | 0.3 | under constructionupdated Jan 2025 | Sep 2021 | granted Jul 2023 | Jan 2025 | Milton Keynes | 2.0 |
| Tanners Drive, Blakelandsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2023 | Jul 2023 | granted Sep 2023 | Sep 2023 | Milton Keynes | 2.5 |
| Wolverton Road, Giffard Park Roundabout - Micro Energy Storagebattery storage | battery storage | 0.2 | application submittedupdated Feb 2025 | Feb 2025 | — | Feb 2025 | Milton Keynes | 2.7 |
| Falcon Projectbattery storage | battery storage | 0.3 | operationalupdated Oct 2018 | — | — | Oct 2018 | Milton Keynes | 2.7 |
| The Milton Keynes Academy, Fulwoods Driverooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jan 2026 | Nov 2025 | granted Dec 2025 | Jan 2026 | Milton Keynes | 3.2 |
| Blum Ukrooftop solar | rooftop solar | — | operationalupdated Aug 2023 | — | — | Aug 2023 | Milton Keynes | 3.4 |
| Verge In Woughton Leisure Centre - Micro Energy Storagebattery storage | battery storage | 0.2 | approved, not builtupdated Jan 2026 | Oct 2025 | granted Dec 2025 | Jan 2026 | Milton Keynes | 3.5 |
| Hammerwood Gate, By University Roundabout - Micro Energy Storagebattery storage | battery storage | 0.2 | approved, not builtupdated Mar 2026 | Dec 2025 | granted Jan 2026 | Mar 2026 | Milton Keynes | 3.6 |
| Duckworth Court, Oldbrook Boulevard - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated Apr 2025 | Dec 2024 | granted Mar 2025 | Apr 2025 | Milton Keynes | 3.7 |
| Gosh Foods, Maidstone Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Mar 2023 | Dec 2022 | granted Feb 2023 | Mar 2023 | Milton Keynes | 3.8 |
| Standing Way -Micro Energy Storagebattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2025 | May 2025 | granted Jul 2025 | Nov 2025 | Milton Keynes | 3.9 |
| Deltic Avenue, Rooksleyrooftop solar | rooftop solar | 0.3 | approved, not builtupdated May 2024 | Mar 2024 | granted May 2024 | May 2024 | Milton Keynes | 4.0 |
| Winterhill Houserooftop solar | rooftop solar | 0.2 | approved, not builtupdated Nov 2021 | Sep 2021 | granted Nov 2021 | Nov 2021 | Milton Keynes | 4.1 |
| Langland Road, Netherfield - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | refusedupdated Feb 2026 | Nov 2025 | refused Jan 2026 | Feb 2026 | Milton Keynes | 4.3 |
| Bradwell Road, Loughton Lodgerooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jun 2022 | Apr 2022 | granted Jun 2022 | Jun 2022 | Milton Keynes | 4.3 |
| Midway Centre, Harding Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jun 2023 | May 2023 | granted Jul 2023 | Jun 2023 | Milton Keynes | 4.3 |
| New Bradwell School, Bounty Streetrooftop solar | rooftop solar | — | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | Milton Keynes | 4.4 |
| Pear Tree Lane, Bleak Hall - Micro Energy Storagebattery storage | battery storage | 0.2 | approved, not builtupdated Apr 2025 | Nov 2024 | granted Feb 2025 | Apr 2025 | Milton Keynes | 4.4 |
| Bradwell Road - Micro Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated Jan 2026 | Nov 2025 | granted Jan 2026 | Jan 2026 | Milton Keynes | 4.4 |
| Fingle Drive, Grafton Streetbattery storage | battery storage | 0.2 | refusedupdated Apr 2025 | Nov 2024 | refused Mar 2025 | Apr 2025 | Milton Keynes | 4.5 |
| Alston Drive, Bradwell Abbey - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2025 | May 2025 | granted Jul 2025 | Nov 2025 | Milton Keynes | 4.5 |
| Vodafone, Fingle Driverooftop solar | rooftop solar | 0.3 | approved, not builtupdated Apr 2023 | Jan 2023 | granted Mar 2023 | Apr 2023 | Milton Keynes | 4.7 |
| Kelvin Drive - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated Feb 2025 | Nov 2024 | granted Jan 2025 | Feb 2025 | Milton Keynes | 4.7 |
| Volkswagen Group UK, Garamonde Driverooftop solar | rooftop solar | 0.7 | approved, not builtupdated Dec 2025 | Sep 2024 | granted Jan 2025 | Dec 2025 | Milton Keynes | 4.8 |
| Grafton Street, End Of Dunsby Road - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated Feb 2025 | Dec 2024 | granted Jan 2025 | Feb 2025 | Milton Keynes | 4.8 |
| A G Barr Plc, Crossley Driverooftop solar | rooftop solar | 0.9 | approved, not builtupdated Jan 2024 | Oct 2023 | granted Dec 2023 | Jan 2024 | Milton Keynes | 4.8 |
| Brioche Pasquier, Garamonde Driverooftop solar | rooftop solar | 0.9 | refusedupdated May 2024 | Mar 2024 | refused May 2024 | May 2024 | Milton Keynes | 4.8 |
| Thornbury, West Ashlandrooftop solar | rooftop solar | 0.9 | approved, not builtupdated Apr 2023 | Jan 2023 | granted Mar 2023 | Apr 2023 | Milton Keynes | 4.8 |
| The Venue MK, Hindhead Knoll - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated Dec 2025 | Oct 2025 | granted Dec 2025 | Dec 2025 | Milton Keynes | 4.8 |
| Glebe Farm All Through School, Burney Driverooftop solar | rooftop solar | 0.2 | approved, not builtupdated Apr 2025 | Jan 2025 | granted Feb 2025 | Apr 2025 | Milton Keynes | 4.9 |
| The Church Of The Latterday Saints, The High Streetbattery storage | battery storage | 0.2 | approved, not builtupdated Feb 2025 | Nov 2024 | granted Jan 2025 | Feb 2025 | Milton Keynes | 5.0 |
| Paynes Drive & Linceslade Grove, Loughton - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | refusedupdated Apr 2025 | Nov 2024 | refused Feb 2025 | Apr 2025 | Milton Keynes | 5.0 |
| Brioche Pasquier UK, Garamonde Drive Solar Canopiesrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Feb 2025 | Oct 2024 | granted Jan 2025 | Feb 2025 | Milton Keynes | 5.0 |
| Saxon Street, Dawson Roadbattery storage | battery storage | 0.2 | application withdrawnupdated Jul 2025 | Jun 2025 | — | Jul 2025 | Milton Keynes | 5.3 |
| Dawson Road, Bletchleyrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jun 2022 | Jun 2022 | granted Aug 2022 | Jun 2022 | Milton Keynes | 5.3 |
| Dawson Rentals Vans, Dawson Road Solar Carport Canopy & BESSrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jun 2024 | Apr 2024 | granted May 2024 | Jun 2024 | Milton Keynes | 5.3 |
| The Town Hallrooftop solar | rooftop solar | — | refusedupdated Apr 2021 | Jan 2021 | refused May 2021 | Apr 2021 | Milton Keynes | 5.3 |
| Dawson Road, Bletchleyrooftop solar | rooftop solar | 0.3 | application submitted may be out of dateupdated Oct 2021 | Oct 2021 | — | Oct 2021 | Milton Keynes | 5.4 |
| Fen Street- Solar Panelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Apr 2022 | Mar 2022 | granted May 2022 | Apr 2022 | Milton Keynes | 5.4 |
| Paxton Crescent, Ackroyd Place - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | application withdrawnupdated Jan 2025 | Nov 2024 | — | Jan 2025 | Milton Keynes | 5.6 |
| Stone Hill Energy Storage Facilitybattery storage | battery storage | 0.2 | application withdrawnupdated Jan 2025 | Nov 2024 | — | Jan 2025 | Milton Keynes | 5.7 |
| Hodge Lea Lane, Hodge Leabattery storage | battery storage | 0.2 | refusedupdated Feb 2025 | Nov 2024 | refused Jan 2025 | Feb 2025 | Milton Keynes | 5.8 |
| Watling Street - Micro Energy Storagebattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2025 | Jul 2025 | granted Aug 2025 | Nov 2025 | Milton Keynes | 5.8 |
| Red Bull Racing Wind Tunnel, Sherbourne Drive – Solar Panelsrooftop solar | rooftop solar | 0.3 | under construction | Mar 2024 | granted Apr 2026 | — | Milton Keynes | 5.9 |
| Unit 2, Watling Streetrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2024 | May 2024 | granted Jul 2024 | Jul 2024 | Milton Keynes | 6.0 |
| Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panelsrooftop solar | rooftop solar | 0.3 | operational | Aug 2022 | granted Sep 2023 | — | Milton Keynes | 6.0 |
| Third Avenue, Bletchleyrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Dec 2025 | Aug 2025 | granted Nov 2025 | Dec 2025 | Milton Keynes | 6.0 |
| Sensient Flavours, Bilton Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jun 2023 | Apr 2023 | granted May 2023 | Jun 2023 | Milton Keynes | 6.0 |
| Red Bull Racing, Bradbourne Driverooftop solar | rooftop solar | 0.6 | operationalupdated Jul 2026 | Jan 2026 | granted Mar 2026 | Jul 2026 | Milton Keynes | 6.0 |
| Brickhill Street, Heybridge Crescentbattery storage | battery storage | 0.2 | application withdrawnupdated Jul 2025 | May 2025 | — | Jul 2025 | Milton Keynes | 6.0 |
| Wolverton Swimming & Fitness Centre, Addington Avenuebattery storage | battery storage | 0.2 | approved, not builtupdated Apr 2025 | Jan 2025 | granted Mar 2025 | Apr 2025 | Milton Keynes | 6.1 |
17 more projects not listed (furthest or smallest).
Distance from the average position of the MK15 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.
By type
| Type | All | Pending | Approved | Operational | Refused | MW in pipeline |
|---|---|---|---|---|---|---|
| Solar farm | 9 | 0 | 2 | 6 | 0 | 77 |
| Rooftop solar | 46 | 2 | 37 | 5 | 2 | 21.3 |
| Wind farm | 4 | 0 | 0 | 1 | 2 | 0 |
| Battery storage | 35 | 2 | 21 | 1 | 5 | 4.6 |
MW in pipeline: pending, approved and under-construction capacity.
How Milton Keynes decides solar, wind and battery applications
| Applications | Milton Keynes | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 77 | 10,236 |
| Refused | 10 (13%) | 19% |
| Solar refused | 4 of 49 | 12% |
| Onshore wind refused | 1 of 2 | 45% |
| Battery storage refused | 5 of 26 | 16% |
| Median time from submission to decision | 7.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Is the status up to date?
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near MK15, 4 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.