Energy Projects Near You

Solar, wind and battery projects near Milton Keynes (MK14)

99 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of MK14 (Milton Keynes): 5 are waiting for a planning decision, 60 approved but not yet running, 17 operational. The largest live scheme is Yardley Road Solar Farm (40 MW solar farm, application submitted on 30 June 2025, no decision recorded), 9.3 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

99projects within 10 km
5awaiting a decision
60approved, not running
17operational

Projects within 10 km of MK14

Projects of 1 MW and more (23)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Mercedes Benz UK Solar array car portrooftop solarrooftop solar2approved, not built may be out of dateupdated Dec 2021Jun 2021granted Sep 2021Dec 2021Milton Keynes1.6
Orchard Way Wind Farmwind farmwind farm15refused on appealupdated Aug 2014Sep 2011refused Nov 2012Aug 2014Milton Keynes3.4
The Kicklessolar farmsolar farm5operationalupdated Apr 2016May 2014granted Nov 2014Apr 2016Milton Keynes3.7
Chippenham Drive, Kingstonrooftop solarrooftop solar1.8approved, not builtupdated Jul 2024May 2024granted Jul 2024Jul 2024Milton Keynes5.8
Harvie Card Wayrooftop solarrooftop solar2operationalupdated Dec 2021Jun 2021granted Oct 2021Dec 2021Milton Keynes7.2
Stoke Heights Wind Farmwind farmwind farm30application withdrawnupdated Feb 2018Jun 2011—Feb 2018Milton Keynes7.4
Littlewood Farmsolar farmsolar farm14operationalupdated Aug 2015Jun 2014granted Oct 2014Aug 2015Milton Keynes7.8
Knotwood Fields Farmsolar farmsolar farm2.6permission expiredupdated Aug 2019Sep 2015granted Dec 2015Aug 2019West Northamptonshire7.9
Oaks Farm Solar Farmsolar farmsolar farm37approved, not builtupdated Jul 2026Jul 2025granted May 2026Jul 2026Buckinghamshire8.0
DHL Supply Chain, Pendeen Crescent -Solar Panelsrooftop solarrooftop solar1.2approved, not builtupdated Aug 2024Jun 2024granted Jul 2024Aug 2024Milton Keynes8.1
Pendeen Crescent, Snelshall Eastrooftop solarrooftop solar1.2application submitted may be out of dateupdated Apr 2024Apr 2024—Apr 2024Milton Keynes8.2
Delico, Steinbeck Crescentrooftop solarrooftop solar1.6approved, not built may be out of dateupdated May 2023Jan 2023granted Apr 2023May 2023Milton Keynes8.6
Milton Keynes Wind Farmwind farmwind farm14operationalupdated Dec 2017Aug 2006granted Jan 2008Dec 2017Milton Keynes9.0
Land At Potash Farmsolar farmsolar farm7operationalupdated Sep 2015Feb 2011granted Apr 2011Sep 2015Buckinghamshire9.1
Rectory Farm/Embertonsolar farmsolar farm9operationalupdated Apr 2015Feb 2014granted Sep 2014Apr 2015Milton Keynes9.2
Stony Energy Storage Facilitybattery storagebattery storage79.9operationalupdated May 2024Jul 2017granted Sep 2021May 2024Buckinghamshire9.2
Salcey Solar Farmsolar farmsolar farm5operationalupdated Jul 2018Dec 2013granted Mar 2014Jul 2018Milton Keynes9.2
Yardley Road Solar Farmsolar farmsolar farm40application submittedupdated Aug 2025Jun 2025—Aug 2025West Northamptonshire9.3
Stratford Road Solar Farmsolar farmsolar farm5approved, not built may be out of dateupdated Dec 2021Dec 2020granted Jan 2022Dec 2021Buckinghamshire9.5
Cranfield Airfieldsolar farmsolar farm1operationalupdated Jan 2019Oct 2017granted May 2020Jan 2019Central Bedfordshire9.8
Mount Mill Farmsolar farmsolar farm12operationalupdated May 2015Aug 2014granted Sep 2014May 2015West Northamptonshire9.9
Manor Farm, Beachampton Solar Farmsolar farmsolar farm25approved, not builtupdated Apr 2026Oct 2022granted Jan 2024Apr 2026Buckinghamshire9.9
Salcey Green Farmsolar farmsolar farm5refusedupdated Jul 2024Apr 2024refused Jul 2024Jul 2024Milton Keynes9.9
Smaller schemes under 1 MW, mostly rooftop solar (60)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
St Leger Drive, Great Linford - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Apr 2025Nov 2024granted Feb 2025Apr 2025Milton Keynes0.4
Linford Wood Business Park, Linford Woodrooftop solarrooftop solar0.4approved, not builtupdated Apr 2024Feb 2024granted Mar 2024Apr 2024Milton Keynes0.7
Yeomans Drive, Blakelands - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated May 2025Jan 2025granted Mar 2025May 2025Milton Keynes1.6
Tanners Drive, Blakelandsrooftop solarrooftop solar0.2approved, not builtupdated Sep 2023Jul 2023granted Sep 2023Sep 2023Milton Keynes1.8
Delaware Drive, Tongwellrooftop solarrooftop solar0.5approved, not builtupdated Jan 2025Oct 2024granted Nov 2024Jan 2025Milton Keynes1.9
Wolverton Road, Giffard Park Roundabout - Micro Energy Storagebattery storagebattery storage0.2application submittedupdated Feb 2025Feb 2025—Feb 2025Milton Keynes1.9
David Lloyd, Livingstone Driverooftop solarrooftop solar0.6approved, not builtupdated Nov 2023Sep 2023granted Nov 2023Nov 2023Milton Keynes2.0
Brickhill Street, Lakeside Roundabout - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Nov 2025May 2025granted Jul 2025Nov 2025Milton Keynes2.2
Falcon Projectbattery storagebattery storage0.3operationalupdated Oct 2018——Oct 2018Milton Keynes2.6
New Bradwell School, Bounty Streetrooftop solarrooftop solar—approved, not builtupdated Jun 2026Mar 2026granted May 2026Jun 2026Milton Keynes2.6
Fingle Drive, Grafton Streetbattery storagebattery storage0.2refusedupdated Apr 2025Nov 2024refused Mar 2025Apr 2025Milton Keynes2.8
Caldecote Farm - Storage & Distribution Unitrooftop solarrooftop solar0.3under constructionupdated Jan 2025Sep 2021granted Jul 2023Jan 2025Milton Keynes2.8
Vodafone, Fingle Driverooftop solarrooftop solar0.3approved, not builtupdated Apr 2023Jan 2023granted Mar 2023Apr 2023Milton Keynes3.0
Deltic Avenue, Rooksleyrooftop solarrooftop solar0.3approved, not builtupdated May 2024Mar 2024granted May 2024May 2024Milton Keynes3.1
Alston Drive, Bradwell Abbey - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Nov 2025May 2025granted Jul 2025Nov 2025Milton Keynes3.3
Northfield Drive, Northfield Solar Panlesrooftop solarrooftop solar0.8approved, not builtupdated Feb 2022Feb 2022granted Mar 2022Feb 2022Milton Keynes3.3
Northfield Drive, Tongwell Street - Micro Energy Storage Systembattery storagebattery storage0.2approved, not builtupdated Apr 2025Dec 2024granted Feb 2025Apr 2025Milton Keynes3.3
Bradwell Road, Loughton Lodgerooftop solarrooftop solar0.5approved, not builtupdated Jun 2022Apr 2022granted Jun 2022Jun 2022Milton Keynes3.5
Brioche Pasquier, Garamonde Driverooftop solarrooftop solar0.9refusedupdated May 2024Mar 2024refused May 2024May 2024Milton Keynes3.6
Bradwell Road - Micro Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Jan 2026Nov 2025granted Jan 2026Jan 2026Milton Keynes3.6
The Town Hallrooftop solarrooftop solar—refusedupdated Apr 2021Jan 2021refused May 2021Apr 2021Milton Keynes3.6
Volkswagen Group UK, Garamonde Driverooftop solarrooftop solar0.7approved, not builtupdated Dec 2025Sep 2024granted Jan 2025Dec 2025Milton Keynes3.6
Northfield Drive, Northfield Driverooftop solarrooftop solar0.3approved, not builtupdated Apr 2024Feb 2024granted Mar 2024Apr 2024Milton Keynes3.7
Brioche Pasquier UK, Garamonde Drive Solar Canopiesrooftop solarrooftop solar0.6approved, not builtupdated Feb 2025Oct 2024granted Jan 2025Feb 2025Milton Keynes3.8
The Milton Keynes Academy, Fulwoods Driverooftop solarrooftop solar0.3approved, not builtupdated Jan 2026Nov 2025granted Dec 2025Jan 2026Milton Keynes3.8
Duckworth Court, Oldbrook Boulevard - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Apr 2025Dec 2024granted Mar 2025Apr 2025Milton Keynes3.8
The Church Of The Latterday Saints, The High Streetbattery storagebattery storage0.2approved, not builtupdated Feb 2025Nov 2024granted Jan 2025Feb 2025Milton Keynes4.0
Verge In Woughton Leisure Centre - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Jan 2026Oct 2025granted Dec 2025Jan 2026Milton Keynes4.0
Winterhill Houserooftop solarrooftop solar0.2approved, not builtupdated Nov 2021Sep 2021granted Nov 2021Nov 2021Milton Keynes4.2
Hodge Lea Lane, Hodge Leabattery storagebattery storage0.2refusedupdated Feb 2025Nov 2024refused Jan 2025Feb 2025Milton Keynes4.3
Paynes Drive & Linceslade Grove, Loughton - Micro Energy Storage Facilitybattery storagebattery storage0.2refusedupdated Apr 2025Nov 2024refused Feb 2025Apr 2025Milton Keynes4.3
Wolverton Swimming & Fitness Centre, Addington Avenuebattery storagebattery storage0.2approved, not builtupdated Apr 2025Jan 2025granted Mar 2025Apr 2025Milton Keynes4.4
Stone Hill Energy Storage Facilitybattery storagebattery storage0.2application withdrawnupdated Jan 2025Nov 2024—Jan 2025Milton Keynes4.6
Kelvin Drive - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Feb 2025Nov 2024granted Jan 2025Feb 2025Milton Keynes4.7
Pear Tree Lane, Bleak Hall - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Apr 2025Nov 2024granted Feb 2025Apr 2025Milton Keynes4.7
Wolverton Swimming And Fitness Centre, Addington Avenuerooftop solarrooftop solar0.4approved, not builtupdated Dec 2025Sep 2025granted Oct 2025Dec 2025Milton Keynes4.8
Ingram Content Group UK, Chapter Houserooftop solarrooftop solar1approved, not builtupdated Aug 2023Jun 2023granted Aug 2023Aug 2023Milton Keynes4.9
Burners Lane, Kiln Farmrooftop solarrooftop solar0.5approved, not builtupdated Nov 2025Jul 2025granted Aug 2025Nov 2025Milton Keynes5.1
Hammerwood Gate, By University Roundabout - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Mar 2026Dec 2025granted Jan 2026Mar 2026Milton Keynes5.2
Blum Ukrooftop solarrooftop solar—operationalupdated Aug 2023——Aug 2023Milton Keynes5.2
Paxton Crescent, Ackroyd Place - Micro Energy Storage Facilitybattery storagebattery storage0.2application withdrawnupdated Jan 2025Nov 2024—Jan 2025Milton Keynes5.3
Langland Road, Netherfield - Micro Energy Storage Facilitybattery storagebattery storage0.2refusedupdated Feb 2026Nov 2025refused Jan 2026Feb 2026Milton Keynes5.3
Grafton Street, End Of Dunsby Road - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Feb 2025Dec 2024granted Jan 2025Feb 2025Milton Keynes5.4
Gosh Foods, Maidstone Roadrooftop solarrooftop solar0.5approved, not builtupdated Mar 2023Dec 2022granted Feb 2023Mar 2023Milton Keynes5.6
Standing Way -Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Nov 2025May 2025granted Jul 2025Nov 2025Milton Keynes5.6
Thornbury, West Ashlandrooftop solarrooftop solar0.9approved, not builtupdated Apr 2023Jan 2023granted Mar 2023Apr 2023Milton Keynes5.7
Midway Centre, Harding Roadrooftop solarrooftop solar0.5approved, not builtupdated Jun 2023May 2023granted Jul 2023Jun 2023Milton Keynes6.1
Saxon Street, Dawson Roadbattery storagebattery storage0.2application withdrawnupdated Jul 2025Jun 2025—Jul 2025Milton Keynes6.2
The Hazeley Academyrooftop solarrooftop solar0.2operationalupdated Oct 2019Feb 2019granted May 2020Oct 2019Milton Keynes6.2
Dawson Road, Bletchleyrooftop solarrooftop solar0.3application submitted may be out of dateupdated Oct 2021Oct 2021—Oct 2021Milton Keynes6.3
Dawson Road, Bletchleyrooftop solarrooftop solar0.3approved, not builtupdated Jun 2022Jun 2022granted Aug 2022Jun 2022Milton Keynes6.3
Dawson Rentals Vans, Dawson Road Solar Carport Canopy & BESSrooftop solarrooftop solar0.3approved, not builtupdated Jun 2024Apr 2024granted May 2024Jun 2024Milton Keynes6.3
The Venue MK, Hindhead Knoll - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Dec 2025Oct 2025granted Dec 2025Dec 2025Milton Keynes6.4
Watling Street - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Nov 2025Jul 2025granted Aug 2025Nov 2025Milton Keynes6.5
A G Barr Plc, Crossley Driverooftop solarrooftop solar0.9approved, not builtupdated Jan 2024Oct 2023granted Dec 2023Jan 2024Milton Keynes6.6
Glebe Farm All Through School, Burney Driverooftop solarrooftop solar0.2approved, not builtupdated Apr 2025Jan 2025granted Feb 2025Apr 2025Milton Keynes6.7
Third Avenue, Bletchleyrooftop solarrooftop solar0.2approved, not builtupdated Dec 2025Aug 2025granted Nov 2025Dec 2025Milton Keynes6.8
Unit 2, Watling Streetrooftop solarrooftop solar0.2approved, not builtupdated Jul 2024May 2024granted Jul 2024Jul 2024Milton Keynes6.9
Sensient Flavours, Bilton Roadrooftop solarrooftop solar0.5approved, not builtupdated Jun 2023Apr 2023granted May 2023Jun 2023Milton Keynes7.1
Fen Street- Solar Panelsrooftop solarrooftop solar0.2approved, not builtupdated Apr 2022Mar 2022granted May 2022Apr 2022Milton Keynes7.2

16 more projects not listed (furthest or smallest).

Distance from the average position of the MK14 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm151391107
Rooftop solar452365220.9
Wind farm300110
Battery storage36221254.6

MW in pipeline: pending, approved and under-construction capacity.

How Milton Keynes decides solar, wind and battery applications

ApplicationsMilton KeynesUK
Decided applications (solar, wind, battery)7710,236
Refused10 (13%)19%
Solar refused4 of 4912%
Onshore wind refused1 of 245%
Battery storage refused5 of 2616%
Median time from submission to decision7.9 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

All projects in Milton Keynes

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near MK14, 5 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.