Solar, wind and battery projects near Newport Pagnell (MK16)

88 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of MK16 (Milton Keynes): 3 are waiting for a planning decision, 52 approved but not yet running, 18 operational. The largest live scheme is Snakes Meadow Solar Farm (45.5 MW solar farm, approved on 8 May 2024, not yet built), 9.3 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

88projects within 10 km
3awaiting a decision
52approved, not running
18operational

Projects within 10 km of MK16

Projects of 1 MW and more (18)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
The Kicklessolar farmsolar farm5operationalupdated Apr 2016May 2014granted Nov 2014Apr 2016Milton Keynes1.6
Mercedes Benz UK Solar array car portrooftop solarrooftop solar2approved, not built may be out of dateupdated Dec 2021Jun 2021granted Sep 2021Dec 2021Milton Keynes2.9
Orchard Way Wind Farmwind farmwind farm15refused on appealupdated Aug 2014Sep 2011refused Nov 2012Aug 2014Milton Keynes4.5
Milton Keynes Wind Farmwind farmwind farm14operationalupdated Dec 2017Aug 2006granted Jan 2008Dec 2017Milton Keynes5.4
Rectory Farm/Embertonsolar farmsolar farm9operationalupdated Apr 2015Feb 2014granted Sep 2014Apr 2015Milton Keynes5.6
Stoke Heights Wind Farmwind farmwind farm30application withdrawnupdated Feb 2018Jun 2011—Feb 2018Milton Keynes5.9
Chippenham Drive, Kingstonrooftop solarrooftop solar1.8approved, not builtupdated Jul 2024May 2024granted Jul 2024Jul 2024Milton Keynes6.3
Salcey Solar Farmsolar farmsolar farm5operationalupdated Jul 2018Dec 2013granted Mar 2014Jul 2018Milton Keynes6.8
Harvie Card Wayrooftop solarrooftop solar2operationalupdated Dec 2021Jun 2021granted Oct 2021Dec 2021Milton Keynes7.0
Littlewood Farmsolar farmsolar farm14operationalupdated Aug 2015Jun 2014granted Oct 2014Aug 2015Milton Keynes7.0
Cranfield Airfieldsolar farmsolar farm1operationalupdated Jan 2019Oct 2017granted May 2020Jan 2019Central Bedfordshire7.9
Salcey Solar Farmbattery storagebattery storage1operationalupdated Mar 2019Mar 2016—Mar 2019Milton Keynes8.7
Snakes Meadow Solar Farmsolar farmsolar farm45.5approved, not builtupdated Jun 2026Oct 2021granted May 2024Jun 2026Bedford9.3
Salcey Green Farmsolar farmsolar farm5refusedupdated Jul 2024Apr 2024refused Jul 2024Jul 2024Milton Keynes9.3
Bulls Head Farm Northsolar farmsolar farm4.7operationalupdated Feb 2015Dec 2013granted Apr 2014Feb 2015West Northamptonshire9.4
Hyde Farmsolar farmsolar farm5operationalupdated Apr 2017Aug 2015granted Jan 2016Apr 2017Milton Keynes9.7
Stonepit Farmsolar farmsolar farm5operationalupdated May 2016Sep 2013granted Dec 2013May 2016West Northamptonshire9.9
Brogborough Landfill, Lidlington Solar PV parksolar farmsolar farm40approved, not builtupdated Feb 2026Mar 2022granted Apr 2024Feb 2026Central Bedfordshire10.0
Smaller schemes under 1 MW, mostly rooftop solar (60)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Caldecote Farm - Storage & Distribution Unitrooftop solarrooftop solar0.3under constructionupdated Jan 2025Sep 2021granted Jul 2023Jan 2025Milton Keynes1.9
Wolverton Road, Giffard Park Roundabout - Micro Energy Storagebattery storagebattery storage0.2application submittedupdated Feb 2025Feb 2025—Feb 2025Milton Keynes2.0
Tanners Drive, Blakelandsrooftop solarrooftop solar0.2approved, not builtupdated Sep 2023Jul 2023granted Sep 2023Sep 2023Milton Keynes2.0
Yeomans Drive, Blakelands - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated May 2025Jan 2025granted Mar 2025May 2025Milton Keynes2.3
Delaware Drive, Tongwellrooftop solarrooftop solar0.5approved, not builtupdated Jan 2025Oct 2024granted Nov 2024Jan 2025Milton Keynes2.4
St Leger Drive, Great Linford - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Apr 2025Nov 2024granted Feb 2025Apr 2025Milton Keynes3.4
Northfield Drive, Northfield Solar Panlesrooftop solarrooftop solar0.8approved, not builtupdated Feb 2022Feb 2022granted Mar 2022Feb 2022Milton Keynes4.1
David Lloyd, Livingstone Driverooftop solarrooftop solar0.6approved, not builtupdated Nov 2023Sep 2023granted Nov 2023Nov 2023Milton Keynes4.2
Northfield Drive, Tongwell Street - Micro Energy Storage Systembattery storagebattery storage0.2approved, not builtupdated Apr 2025Dec 2024granted Feb 2025Apr 2025Milton Keynes4.2
Brickhill Street, Lakeside Roundabout - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Nov 2025May 2025granted Jul 2025Nov 2025Milton Keynes4.3
Linford Wood Business Park, Linford Woodrooftop solarrooftop solar0.4approved, not builtupdated Apr 2024Feb 2024granted Mar 2024Apr 2024Milton Keynes4.4
Northfield Drive, Northfield Driverooftop solarrooftop solar0.3approved, not builtupdated Apr 2024Feb 2024granted Mar 2024Apr 2024Milton Keynes4.4
New Bradwell School, Bounty Streetrooftop solarrooftop solar—approved, not builtupdated Jun 2026Mar 2026granted May 2026Jun 2026Milton Keynes5.7
Olney Road, Harvey Drive - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated May 2025Jan 2025granted Mar 2025May 2025Milton Keynes5.8
Blum Ukrooftop solarrooftop solar—operationalupdated Aug 2023——Aug 2023Milton Keynes5.9
Fingle Drive, Grafton Streetbattery storagebattery storage0.2refusedupdated Apr 2025Nov 2024refused Mar 2025Apr 2025Milton Keynes6.0
Falcon Projectbattery storagebattery storage0.3operationalupdated Oct 2018——Oct 2018Milton Keynes6.0
Gosh Foods, Maidstone Roadrooftop solarrooftop solar0.5approved, not builtupdated Mar 2023Dec 2022granted Feb 2023Mar 2023Milton Keynes6.1
Vodafone, Fingle Driverooftop solarrooftop solar0.3approved, not builtupdated Apr 2023Jan 2023granted Mar 2023Apr 2023Milton Keynes6.2
University Way, Cranfieldsolar farmsolar farm0.9operationalupdated Jul 2023Nov 2022granted Mar 2023Jul 2023Central Bedfordshire6.4
Cranfield University Solar Farmsolar farmsolar farm0.4operationalupdated Jan 2022Jan 2021granted Aug 2021Jan 2022Central Bedfordshire6.6
The Town Hallrooftop solarrooftop solar—refusedupdated Apr 2021Jan 2021refused May 2021Apr 2021Milton Keynes6.6
Standing Way -Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Nov 2025May 2025granted Jul 2025Nov 2025Milton Keynes6.7
Hammerwood Gate, By University Roundabout - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Mar 2026Dec 2025granted Jan 2026Mar 2026Milton Keynes6.8
Deltic Avenue, Rooksleyrooftop solarrooftop solar0.3approved, not builtupdated May 2024Mar 2024granted May 2024May 2024Milton Keynes6.8
The Milton Keynes Academy, Fulwoods Driverooftop solarrooftop solar0.3approved, not builtupdated Jan 2026Nov 2025granted Dec 2025Jan 2026Milton Keynes6.9
Alston Drive, Bradwell Abbey - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Nov 2025May 2025granted Jul 2025Nov 2025Milton Keynes6.9
Midway Centre, Harding Roadrooftop solarrooftop solar0.5approved, not builtupdated Jun 2023May 2023granted Jul 2023Jun 2023Milton Keynes6.9
A G Barr Plc, Crossley Driverooftop solarrooftop solar0.9approved, not builtupdated Jan 2024Oct 2023granted Dec 2023Jan 2024Milton Keynes6.9
Verge In Woughton Leisure Centre - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Jan 2026Oct 2025granted Dec 2025Jan 2026Milton Keynes7.1
Duckworth Court, Oldbrook Boulevard - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Apr 2025Dec 2024granted Mar 2025Apr 2025Milton Keynes7.2
Bradwell Road, Loughton Lodgerooftop solarrooftop solar0.5approved, not builtupdated Jun 2022Apr 2022granted Jun 2022Jun 2022Milton Keynes7.2
Brioche Pasquier, Garamonde Driverooftop solarrooftop solar0.9refusedupdated May 2024Mar 2024refused May 2024May 2024Milton Keynes7.2
Fen Street- Solar Panelsrooftop solarrooftop solar0.2approved, not builtupdated Apr 2022Mar 2022granted May 2022Apr 2022Milton Keynes7.2
Bradwell Road - Micro Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Jan 2026Nov 2025granted Jan 2026Jan 2026Milton Keynes7.3
Glebe Farm All Through School, Burney Driverooftop solarrooftop solar0.2approved, not builtupdated Apr 2025Jan 2025granted Feb 2025Apr 2025Milton Keynes7.3
Volkswagen Group UK, Garamonde Driverooftop solarrooftop solar0.7approved, not builtupdated Dec 2025Sep 2024granted Jan 2025Dec 2025Milton Keynes7.3
Brioche Pasquier UK, Garamonde Drive Solar Canopiesrooftop solarrooftop solar0.6approved, not builtupdated Feb 2025Oct 2024granted Jan 2025Feb 2025Milton Keynes7.4
Wolverton Swimming & Fitness Centre, Addington Avenuebattery storagebattery storage0.2approved, not builtupdated Apr 2025Jan 2025granted Mar 2025Apr 2025Milton Keynes7.4
Winterhill Houserooftop solarrooftop solar0.2approved, not builtupdated Nov 2021Sep 2021granted Nov 2021Nov 2021Milton Keynes7.6
The Church Of The Latterday Saints, The High Streetbattery storagebattery storage0.2approved, not builtupdated Feb 2025Nov 2024granted Jan 2025Feb 2025Milton Keynes7.7
Hodge Lea Lane, Hodge Leabattery storagebattery storage0.2refusedupdated Feb 2025Nov 2024refused Jan 2025Feb 2025Milton Keynes7.7
Wolverton Swimming And Fitness Centre, Addington Avenuerooftop solarrooftop solar0.4approved, not builtupdated Dec 2025Sep 2025granted Oct 2025Dec 2025Milton Keynes7.9
Langland Road, Netherfield - Micro Energy Storage Facilitybattery storagebattery storage0.2refusedupdated Feb 2026Nov 2025refused Jan 2026Feb 2026Milton Keynes7.9
The Venue MK, Hindhead Knoll - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Dec 2025Oct 2025granted Dec 2025Dec 2025Milton Keynes7.9
Pear Tree Lane, Bleak Hall - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Apr 2025Nov 2024granted Feb 2025Apr 2025Milton Keynes8.0
Paynes Drive & Linceslade Grove, Loughton - Micro Energy Storage Facilitybattery storagebattery storage0.2refusedupdated Apr 2025Nov 2024refused Feb 2025Apr 2025Milton Keynes8.0
Lavendon Roadrooftop solarrooftop solar0.2application submitted may be out of dateupdated Jul 2023Jul 2023—Jul 2023Milton Keynes8.2
Kelvin Drive - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Feb 2025Nov 2024granted Jan 2025Feb 2025Milton Keynes8.2
Stone Hill Energy Storage Facilitybattery storagebattery storage0.2application withdrawnupdated Jan 2025Nov 2024—Jan 2025Milton Keynes8.3
Ingram Content Group UK, Chapter Houserooftop solarrooftop solar1approved, not builtupdated Aug 2023Jun 2023granted Aug 2023Aug 2023Milton Keynes8.4
Grafton Street, End Of Dunsby Road - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Feb 2025Dec 2024granted Jan 2025Feb 2025Milton Keynes8.4
Burners Lane, Kiln Farmrooftop solarrooftop solar0.5approved, not builtupdated Nov 2025Jul 2025granted Aug 2025Nov 2025Milton Keynes8.4
Thornbury, West Ashlandrooftop solarrooftop solar0.9approved, not builtupdated Apr 2023Jan 2023granted Mar 2023Apr 2023Milton Keynes8.5
Saxon Street, Dawson Roadbattery storagebattery storage0.2application withdrawnupdated Jul 2025Jun 2025—Jul 2025Milton Keynes8.9
Dawson Road, Bletchleyrooftop solarrooftop solar0.3approved, not builtupdated Jun 2022Jun 2022granted Aug 2022Jun 2022Milton Keynes8.9
Dawson Rentals Vans, Dawson Road Solar Carport Canopy & BESSrooftop solarrooftop solar0.3approved, not builtupdated Jun 2024Apr 2024granted May 2024Jun 2024Milton Keynes8.9
Paxton Crescent, Ackroyd Place - Micro Energy Storage Facilitybattery storagebattery storage0.2application withdrawnupdated Jan 2025Nov 2024—Jan 2025Milton Keynes8.9
Dawson Road, Bletchleyrooftop solarrooftop solar0.3application submitted may be out of dateupdated Oct 2021Oct 2021—Oct 2021Milton Keynes9.0
Red Bull Racing Wind Tunnel, Sherbourne Drive – Solar Panelsrooftop solarrooftop solar0.3under constructionMar 2024granted Apr 2026—Milton Keynes9.1

10 more projects not listed (furthest or smallest).

Distance from the average position of the MK16 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm140210285.5
Rooftop solar412325216.9
Wind farm300110
Battery storage30118243.8

MW in pipeline: pending, approved and under-construction capacity.

How Milton Keynes decides solar, wind and battery applications

ApplicationsMilton KeynesUK
Decided applications (solar, wind, battery)7710,236
Refused10 (13%)19%
Solar refused4 of 4912%
Onshore wind refused1 of 245%
Battery storage refused5 of 2616%
Median time from submission to decision7.9 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

All projects in Milton Keynes

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near MK16, 3 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.