Energy Projects Near You

Solar, wind and battery projects near Collintraive (PA22)

4 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of PA22 (Argyll and Bute): 1 operational. The largest scheme is Black Craig (47.5 MW wind farm, application withdrawn on 1 December 2009), 7.7 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

4projects within 10 km
0awaiting a decision
0approved, not running
1operational

Projects within 10 km of PA22

Projects of 1 MW and more (4)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Stronafian Community Forest Wind Turbineswind farmwind farm1.6refusedupdated Sep 2016Jul 2015refused Aug 2016Sep 2016Argyll and Bute5.3
Ardtaraig Wind Farmwind farmwind farm29.4refused on appealupdated Dec 2019Aug 2018refused Mar 2019Dec 2019Argyll and Bute6.0
Cruach Mhorwind farmwind farm33.3operationalupdated Jul 2004Sep 2001granted Jun 2002Jul 2004Argyll and Bute7.6
Black Craigwind farmwind farm47.5application withdrawnupdated Dec 2009——Dec 2009Argyll and Bute7.7

Distance from the average position of the PA22 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Wind farm400120

MW in pipeline: pending, approved and under-construction capacity.

How Argyll and Bute decides solar, wind and battery applications

ApplicationsArgyll and ButeUK
Decided applications (solar, wind, battery)4910,236
Refused22 (45%)19%
Solar refused0 of 412%
Onshore wind refused21 of 4145%
Battery storage refused1 of 416%
Median time from submission to decision53.3 weeks17.0 weeks
Appeals lodged / allowed5 / 4—

All projects in Argyll and Bute

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Check the council's planning register for the latest decision.