Achlachan Wind Farm - Phase 2 (6.9 MW)

Achlachan Wind Farm - Phase 2 is a 6.9 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 24 June 2019.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6.9 MWwind farm
abandonedstatus in REPD
24 June 2019record last updated
Highlandcouncil area

Planning timeline

DateStage
21 May 2015Application submitted
24 September 2015Refused by the planning authority
6 November 2015Appeal lodged
29 March 2016Planning permission granted
29 March 2016Appeal allowed

Project details

Technology
wind farm
Capacity
6.9 MW
Status (REPD)
abandoned
Record last updated
24 June 2019
Operator or applicant
Whirlwind Renewables
Planning authority
Highland
Planning application reference
15/01831/FUL
Appeal reference
PPA-270-2142
Turbines
3
Turbine height
110 m
Address (REPD)
Achlachan Windfarm, Watten
Council area (by location)
Highland
Time to decision
45 weeks
REPD reference
4776

Who decides

ApplicationsHighlandUK
Decided applications (solar, wind, battery)16010,236
Refused68 (42%)19%
Solar refused0 of 1512%
Onshore wind refused61 of 11445%
Battery storage refused7 of 3116%
Median time from submission to decision52.3 weeks17.0 weeks
Appeals lodged / allowed20 / 20—

Other large projects within 10 km

ProjectTypeMWStatuskm
Achlachan Wind Farmwind farm10operational0.9
Halsary Wind Farmwind farm34operational1.2
Mybster Farm, Wattenbattery storage19.8application withdrawn1.5
Bad a Cheo Wind Farmwind farm26.7operational2.7
Spittal Mains, Spittalbattery storage300application submitted3.1
Spittal Mains Quarrybattery storage49.9approved, not built3.1
Wind Farm at Achlachan Windfarmwind farm8.5approved, not built3.6
Achiesbattery storage162application submitted3.6
Tormsdale -Wind Farmwind farm50application submitted3.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.4412, -3.4527).