Wind Farm at Achlachan Windfarm (8.5 MW)
Wind Farm at Achlachan Windfarm is an 8.5 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 10 October 2025, not yet built; the record was last updated on 10 November 2025.
8.5 MWwind farm
approved, not builtstatus in REPD
10 November 2025record last updated
Highlandcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 29 April 2025 | Application submitted |
| 10 October 2025 | Planning permission granted |
| 10 October 2030 | Permission due to expire (unless work starts) |
Project details
- Technology
- wind farm
- Capacity
- 8.5 MW
- Status (REPD)
- approved, not built
- Record last updated
- 10 November 2025
- Operator or applicant
- Whirlwind Renewables
- Planning authority
- Highland
- Planning application reference
- 25/01306/FUL
- Turbines
- 2
- Turbine height
- 150 m
- Address (REPD)
- Achlachan Windfarm, Watten, Halkirk
- Council area (by location)
- Highland
- Time to decision
- 23 weeks
- Name in REPD
- Achlachan Wind Farm 2, Watten - Wind Farm
- REPD reference
- 18893
Earlier applications for this site
| Application | MW | Submitted | Outcome |
|---|---|---|---|
| Achlachan 2 Windfarm 15/01831/FUL | 7.5 | 11 May 2015 | refused 18 September 2015 |
Who decides
| Applications | Highland | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 160 | 10,236 |
| Refused | 68 (42%) | 19% |
| Solar refused | 0 of 15 | 12% |
| Onshore wind refused | 61 of 114 | 45% |
| Battery storage refused | 7 of 31 | 16% |
| Median time from submission to decision | 52.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 20 / 20 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Achies | battery storage | 162 | application submitted | <0.1 |
| Mybster Farm, Watten | battery storage | 19.8 | application withdrawn | 2.7 |
| Achlachan Wind Farm | wind farm | 10 | operational | 2.8 |
| Spittal Mains Quarry | battery storage | 49.9 | approved, not built | 3.2 |
| Spittal Mains, Spittal | battery storage | 300 | application submitted | 3.2 |
| Achlachan Wind Farm - Phase 2 | wind farm | 6.9 | abandoned | 3.6 |
| Spittal Hill | wind farm | 21 | refused on appeal | 4.4 |
| Halsary Wind Farm | wind farm | 34 | operational | 4.8 |
| Bad a Cheo Wind Farm | wind farm | 26.7 | operational | 6.3 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.4702, -3.4803).