Bad a Cheo Wind Farm (26.7 MW)

Bad a Cheo Wind Farm is a 26.7 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 May 2019; the record was last updated on 31 May 2019.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

26.7 MWwind farm
operationalstatus in REPD
31 May 2019record last updated
Highlandcouncil area

Planning timeline

DateStage
25 July 2012Application submitted
19 September 2013Refused by the planning authority
6 May 2014Planning permission granted
6 May 2014Appeal allowed
15 March 2017Construction started
1 May 2019Operational

Project details

Technology
wind farm
Capacity
26.7 MW
Status (REPD)
operational
Record last updated
31 May 2019
Operator or applicant
Innogy
Planning authority
Highland
Planning application reference
12/02868/FUL
Appeal reference
13/00052/REFCA
Turbines
13
Turbine height
112 m
Address (REPD)
Bad A Cheo Achkeepster Spittal
Council area (by location)
Highland
Time to decision
93 weeks
Contracts for Difference
AR1
REPD reference
4646

Who decides

ApplicationsHighlandUK
Decided applications (solar, wind, battery)16010,236
Refused68 (42%)19%
Solar refused0 of 1512%
Onshore wind refused61 of 11445%
Battery storage refused7 of 3116%
Median time from submission to decision52.3 weeks17.0 weeks
Appeals lodged / allowed20 / 20—

Other large projects within 10 km

ProjectTypeMWStatuskm
Halsary Wind Farmwind farm34operational1.5
Achlachan Wind Farm - Phase 2wind farm6.9abandoned2.7
Tormsdale -Wind Farmwind farm50application submitted2.8
Achlachan Wind Farmwind farm10operational3.5
Mybster Farm, Wattenbattery storage19.8application withdrawn3.9
Spittal Mains Quarrybattery storage49.9approved, not built5.0
Spittal Mains, Spittalbattery storage300application submitted5.0
Wind Farm at Achlachan Windfarmwind farm8.5approved, not built6.3
Achiesbattery storage162application submitted6.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.4205, -3.4292).