Alfreton Solar Farm (25 MW)

Alfreton Solar Farm is a 25 MW solar farm project in North East Derbyshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 18 March 2022; the record was last updated on 31 January 2021.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

25 MWsolar farm
application withdrawnstatus in REPD
31 January 2021record last updated
North East Derbyshirecouncil area

Planning timeline

DateStage
21 December 2020Application submitted
18 March 2022Application withdrawn

Project details

Technology
solar farm
Capacity
25 MW
Status (REPD)
application withdrawn
Record last updated
31 January 2021
Operator or applicant
Kronos Solar
Planning authority
North East Derbyshire
Planning application reference
20/01282/FL
Site area
31.2 ha
Address (REPD)
Upper Delves Farm, Pit Lane, Shirland, Alfreton
Council area (by location)
North East Derbyshire
Contracts for Difference
AR4
REPD reference
7902

The scheme also includes 25 MW of battery storage, recorded separately in REPD (application withdrawn).

Who decides

ApplicationsNorth East DerbyshireUK
Decided applications (solar, wind, battery)2910,236
Refused5 (17%)19%
Solar refused1 of 1912%
Battery storage refused4 of 1016%
Median time from submission to decision15.3 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Hall Farm Solar Farmsolar farm50refused1.7
Meadow Lane Solar Farmsolar farm19.6under construction1.8
Eden Meadows, Stretton Road, Morton Solar PV Panels & Battery Energy Storage Systemsolar farm49.9refused3.0
Land North of the Wood at Averill Farmsolar farm5operational3.8
Padleywood Farmsolar farm5operational4.0
Averhill Farmsolar farm5operational4.0
Twin Yards Solar Farmsolar farm5operational5.4
Newton Wood Farmbattery storage49.9approved, not built6.0
Hurst Farm, Mansfield Roadbattery storage99.9approved, not built6.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.1129, -1.4013).